12.05.2014 Views

Final Report - Pima Association of Governments

Final Report - Pima Association of Governments

Final Report - Pima Association of Governments

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

High Capacity Transit System Plan - <strong>Final</strong> <strong>Report</strong> June 2009<br />

Transit Technologies Analysis<br />

Table 17<br />

Preliminary HCT Scenario in <strong>Pima</strong> County<br />

Corridor<br />

Possible Implementation Period<br />

Near (2030) Future (2040) Reserve (>2040)<br />

1. U <strong>of</strong> A/Rio Nuevo SC SC SC<br />

2. Broadway/Speedway BRT/LRT BRT, LRT LRT<br />

3. Campbell Ave. EB SC SC<br />

4. Oracle Rd/Stone Ave. BRT/LRT BRT, LRT LRT<br />

5. 6th Ave. BRT BRT SC<br />

6. I-19 EB EB CR<br />

7. I-10 EB, CR CR CR<br />

8. Houghton Rd. EB EB BRT<br />

9. Anklam Rd./6th St. EB BRT BRT<br />

10. Tangerine Rd. FR EB EB<br />

11. Grant Rd. BRT/LRT BRT, LRT BRT, LRT<br />

12. S. Campbell/Kino Pkwy BRT/LRT BRT/LRT SC<br />

13. S. 6th to Airport BRT BRT SC<br />

14. Valencia Rd. EB EB BRT<br />

15. Ajo Way FR EB EB<br />

16. Kolb Rd. EB EB BRT<br />

NOTE: FR = fixed route transit, EB = express bus, BRT = bus rapid transit, SC = street car, LRT =<br />

light rail transit, and CR = commuter rail<br />

Section 5.0 contains a more detailed analysis <strong>of</strong> potential alignments for one or more premium<br />

transit modes in certain corridors, where reasonable alignment and mode options appear to exist.<br />

Further assessment <strong>of</strong> existing and prospective land use along corridors is included, along with<br />

identification <strong>of</strong> potential station locations and mode operating characteristics. Also identified are<br />

major right‐<strong>of</strong>‐way and traffic operating constraints on development <strong>of</strong> dedicated lanes. Given<br />

the limited study budget, the following corridors were initially proposed to be assessed in the<br />

work summarized in Section 5.0 (i.e., Task 5):<br />

• Extension <strong>of</strong> streetcar to South Tucson and north <strong>of</strong> UA<br />

• CRT in the I‐10 corridor<br />

• BRT and/or LRT along Oracle Road/Stone Avenue<br />

• BRT along 6th Avenue<br />

• BRT and/or LRT along Broadway Boulevard vs. Speedway Boulevard vs. Grant Road<br />

• BRT and/or LRT along Campbell Avenue/Kino Parkway to TIA<br />

80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!