High Capacity Transit System Plan - <strong>Final</strong> <strong>Report</strong> June 2009<br />

Future Conditions<br />

3.3 TRANSPORTATION SYSTEM<br />

Traffic Volumes and Level <strong>of</strong> Service<br />

Figure 20 illustrates the roadway network volume‐to‐capacity ratios in 2040. The most heavily<br />

congested corridor in the study area is expected to continue to be the I‐10 corridor. Most<br />

segments <strong>of</strong> I‐10 are expected to exceed capacity by 2040. A large portion <strong>of</strong> I‐19 is also expected<br />

to exceed capacity by 2040.<br />

Major congestion is expected in the vicinity <strong>of</strong> TIA (especially on Old Vail Connection Road),<br />

Broadway Boulevard, Speedway Boulevard, and Grand Road, which are expected to have more<br />

segments exceeding capacity. River Road and Oracle Road are expected to see an increase in the<br />

number <strong>of</strong> segments that exceed capacity. Road segments throughout downtown Tucson are<br />

expected to see an increase in over‐capacity conditions. Valencia Road is projected to have a<br />

reduction in congestion west <strong>of</strong> I‐19, as this segment will no longer exceed capacity likely due to<br />

planned improvements. However, heavy congestion is projected to occur on Valencia Road east<br />

<strong>of</strong> I‐19 in 2040.<br />

Planned and Programmed Improvements<br />

Figure 21 and Figure 22 show the transit and roadway improvements identified in the 20‐year<br />

plan prepared by the Tucson Regional Transportation Authority (RTA) and approved by voters<br />

in 2006.<br />

Identified transit improvements include:<br />

• New express bus routes serving Sahuarita/Green Valley, Ajo, Marana, and Oro Valley,<br />

and enhancements to existing express bus routes.<br />

• Development <strong>of</strong> modern streetcar line connecting Rio Nuevo with U <strong>of</strong> A.<br />

• New park‐n‐rides serving Rita Ranch, West Valencia Road, East Broadway Boulevard,<br />

Marana, Oro Valley, and Green Valley.<br />

• New transit circulators in Marana, Oro Valley/Catalina, and Sahuarita/Green Valley.<br />

Roadway capacity improvements are planned along several arterial roadways including<br />

Houghton Road, Tangerine Road, Valencia Road, Grant Road, Silverbell Road, North Oracle<br />

Road, and La Cholla Boulevard, which are targeted for widening.<br />