High Capacity Transit System Plan - <strong>Final</strong> <strong>Report</strong> June 2009<br />
Refined Corridor Assessment<br />
5.4.2 Capital Costs<br />
Table 22 summarizes the capital cost estimates for the HCT alternatives. It is evident from the<br />
table that the mixed‐traffic BRT alternatives are the least costly. BRT in dedicated lanes on<br />
Broadway Boulevard is also among the least costly alternatives because dedicated lanes already<br />
exist in most <strong>of</strong> the corridor or will be constructed as part <strong>of</strong> a programmed widening project.<br />
LRT and streetcar alternatives have the highest cost because <strong>of</strong> the trackwork, power delivery<br />
infrastructure, vehicles that cost significantly more than buses, and the need for special<br />
garage/storage facilities.<br />
Table 22<br />
Corridor Route Length HCT Scenario<br />
2A - Speedway<br />
Boulevard<br />
2B - Broadway<br />
Boulevard<br />
3 - Campbell Avenue<br />
North<br />
10 miles<br />
11.5 miles<br />
4 - Oracle Road 16 miles<br />
Preliminary Capital Cost Estimates<br />
Total Capital Cost<br />
(2008 dollars)<br />
Capital Cost per Mile<br />
BRT - Mixed Traffic $14,200,000 $1,420,000<br />
BRT - Exclusive Lane $54,500,000 $5,450,000<br />
LRT - Exclusive Lane $589,600,000 $58,960,000<br />
BRT - Exclusive Lane $12,765,000 $1,110,000<br />
LRT - Exclusive Lane $607,085,000 $52,790,000<br />
3.5 miles SC - Mixed Traffic $218,540,000 $62,440,000<br />
BRT - Mixed Traffic $23,040,000 $1,440,000<br />
BRT - Exclusive Lane $87,680,000 $5,480,000<br />
LRT - Exclusive Lane $972,160,000 $60,760,000<br />
7 - I-10/I-19 40 miles CRT $607,300,000 $15,180,000<br />
11 - Grant Road 7.5 miles<br />
12 - Campbell Avenue<br />
South/Kino Parkway<br />
13 - 6th Avenue/<br />
Nogales Highway<br />
8.5 miles<br />
9 miles<br />
NOTE: Park-and-ride lot costs are not included.<br />
BRT - Mixed Traffic $11,985,000 $1,410,000<br />
BRT - Exclusive Lane $40,350,000 $5,380,000<br />
LRT - Exclusive Lane $445,950,000 $59,460,000<br />
BRT - Mixed Traffic $9,540,000 $1,060,000<br />
BRT - Exclusive Lane $46,240,000 $5,440,000<br />
LRT - Exclusive Lane $497,080,000 $58,480,000<br />
BRT - Mixed Traffic $14,200,000 $1,420,000<br />
BRT - Exclusive Lane $45,810,000 $5,090,000<br />
SC - Mixed Traffic $518,490,000 $57,610,000<br />
Operating Costs<br />
Table 23 provides a summary <strong>of</strong> the preliminary operating costs assessment. The Campbell<br />
Avenue South streetcar alternative has the highest annual operating cost and is significantly<br />
higher than the other alternatives. BRT in mixed traffic on the Oracle Road Corridor has the next<br />
highest annual operating cost, followed closely by Grant Road BRT in mixed traffic. The lowest in<br />
annual operating cost is LRT in the Oracle Road Corridor, and the next lowest is LRT on the<br />