Appendix A: <strong>Infrastructure</strong> Schedule<br />
29 February 2012<br />
<strong>Bristol</strong> <strong>Development</strong> <strong>Framework</strong><br />
<strong>Infrastructure</strong> <strong>Delivery</strong> <strong>Programme</strong><br />
Callington Road Link / Bath Road Improvements<br />
Road and/or public transport link from A4320 at St. Philip’s Causeway to A4174 at Callington Road, bypassing A4.<br />
(25 May 2010) Part of a broader package of measures which would also see associated highway improvements to both the A4 Bath Road<br />
and A37 Wells Road.<br />
Transport <strong>Infrastructure</strong><br />
Essential<br />
Further guidance in relation to funding is expected towards the end of 2011, when the current review is concluded, to advise how<br />
scheme could be progressed.<br />
Cost: Funding Sources: Phasing:<br />
£70m 2021‐2026<br />
Risks:<br />
Continued delay and uncertainty over funding for the project will limit the accessibility of South <strong>Bristol</strong><br />
from the strategic route network during the first half of the plan period.<br />
Contingencies:<br />
The spatial strategy can be implemented successfully with effective delivery of the other essential<br />
transport infrastructure, but this scheme is essential to meet the overall objectives for the area<br />
including tackling congestion and climate change. May need to explore other options for improved<br />
transport in the area if funding for this scheme continues to prove problematic.<br />
Relevant Policy Areas:<br />
South <strong>Bristol</strong><br />
Lead Agencies:<br />
West of England Partnership<br />
‐ Page 11 of 41 ‐