Appendix A: <strong>Infrastructure</strong> Schedule<br />

29 February 2012<br />

<strong>Bristol</strong> <strong>Development</strong> <strong>Framework</strong><br />

<strong>Infrastructure</strong> <strong>Delivery</strong> <strong>Programme</strong><br />

Sewerage improvements<br />

A number of schemes are planned to improve environmental performance over the next 5 years, including work to Ashton Avenue<br />

Pumping Station and Avonmouth sewage treatment works. Future development may trigger a need for additional works to local<br />

sewerage networks and/or downstream works to the strategic network.<br />

Water and Drainage <strong>Infrastructure</strong><br />

Essential<br />

Improved sludge treatment plant being currently being built in Avomouth.<br />

Ashton Avenue pumping station going through refurbishment and improvements.<br />

Cost: Funding Sources: Phasing:<br />

Ongoing. £25m for identified<br />

projects.<br />

‐ Private sector funded.<br />

‐ Developers contribute to additional local / downstream<br />

works, the need for which arises from their development.<br />

2006‐2016<br />

Risks:<br />

Demand could outstrip that anticipated.<br />

Contingencies:<br />

Developer contributions could cover additional demand.<br />

Relevant Policy Areas:<br />

Citywide<br />

Lead Agencies:<br />

Wessex Water<br />

‐ Page 22 of 41 ‐