Bristol Development Framework Infrastructure Delivery Programme
Bristol Development Framework Infrastructure Delivery Programme
Bristol Development Framework Infrastructure Delivery Programme
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix A: <strong>Infrastructure</strong> Schedule<br />
29 February 2012<br />
<strong>Bristol</strong> <strong>Development</strong> <strong>Framework</strong><br />
<strong>Infrastructure</strong> <strong>Delivery</strong> <strong>Programme</strong><br />
Mobius Bridge<br />
New pedestrian / cycle bridge between former Courage brewery site and Castle Park.<br />
Transport <strong>Infrastructure</strong><br />
Desirable<br />
Cost: Funding Sources: Phasing:<br />
£1.7m Funded through Finzel’s Reach development. 2011‐2016<br />
Risks:<br />
Contingencies:<br />
Relevant Policy Areas:<br />
City Centre<br />
Lead Agencies:<br />
BCC (City <strong>Development</strong>)<br />
Private developer(s)<br />
Deep sea container terminal<br />
Deep sea container terminal at <strong>Bristol</strong> Port.<br />
Transport <strong>Infrastructure</strong><br />
Desirable<br />
Cost: Funding Sources: Phasing:<br />
£600m Private sector funded. 2011‐2016<br />
Risks:<br />
Contingencies:<br />
Relevant Policy Areas:<br />
Avonmouth and <strong>Bristol</strong> Port<br />
Lead Agencies:<br />
<strong>Bristol</strong> Port Company<br />
‐ Page 18 of 41 ‐