19.05.2014 Views

Bristol Development Framework Infrastructure Delivery Programme

Bristol Development Framework Infrastructure Delivery Programme

Bristol Development Framework Infrastructure Delivery Programme

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix A: <strong>Infrastructure</strong> Schedule<br />

29 February 2012<br />

<strong>Bristol</strong> <strong>Development</strong> <strong>Framework</strong><br />

<strong>Infrastructure</strong> <strong>Delivery</strong> <strong>Programme</strong><br />

New South <strong>Bristol</strong> Centre<br />

A new centre in South <strong>Bristol</strong>. Retail needs still to be identified. Location and type currently subject to a study by consultants.<br />

(3 June 2010) Options for locations are being identified.<br />

Cost: Funding Sources: Phasing:<br />

Options still being explored Likely public / private sector partnership. To be determined<br />

Other <strong>Infrastructure</strong><br />

Essential<br />

Risks:<br />

(3 June 2010) <strong>Development</strong> may not be commercially viable.<br />

Contingencies:<br />

(3 June 2010) Explore policy interventions to secure delivery or reinforce and enhance existing centres<br />

in major areas of change.<br />

Relevant Policy Areas:<br />

South <strong>Bristol</strong><br />

Lead Agencies:<br />

BCC (City <strong>Development</strong>)<br />

Private developer(s)<br />

‐ Page 40 of 41 ‐

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!