Appendix A: <strong>Infrastructure</strong> Schedule<br />
29 February 2012<br />
<strong>Bristol</strong> <strong>Development</strong> <strong>Framework</strong><br />
<strong>Infrastructure</strong> <strong>Delivery</strong> <strong>Programme</strong><br />
New South <strong>Bristol</strong> Centre<br />
A new centre in South <strong>Bristol</strong>. Retail needs still to be identified. Location and type currently subject to a study by consultants.<br />
(3 June 2010) Options for locations are being identified.<br />
Cost: Funding Sources: Phasing:<br />
Options still being explored Likely public / private sector partnership. To be determined<br />
Other <strong>Infrastructure</strong><br />
Essential<br />
Risks:<br />
(3 June 2010) <strong>Development</strong> may not be commercially viable.<br />
Contingencies:<br />
(3 June 2010) Explore policy interventions to secure delivery or reinforce and enhance existing centres<br />
in major areas of change.<br />
Relevant Policy Areas:<br />
South <strong>Bristol</strong><br />
Lead Agencies:<br />
BCC (City <strong>Development</strong>)<br />
Private developer(s)<br />
‐ Page 40 of 41 ‐