Bristol Development Framework Infrastructure Delivery Programme
Bristol Development Framework Infrastructure Delivery Programme
Bristol Development Framework Infrastructure Delivery Programme
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix A: <strong>Infrastructure</strong> Schedule<br />
29 February 2012<br />
<strong>Bristol</strong> <strong>Development</strong> <strong>Framework</strong><br />
<strong>Infrastructure</strong> <strong>Delivery</strong> <strong>Programme</strong><br />
Colston Hall<br />
£20 million new foyer building now complete. Next phase to include refurbishment of existing Hall and backstage areas, to include<br />
creating another theatre / performance space.<br />
Cost: Funding Sources: Phasing:<br />
Not yet available To be determined To be determined<br />
Culture and Leisure <strong>Infrastructure</strong><br />
Desirable<br />
Risks:<br />
Contingencies:<br />
Relevant Policy Areas:<br />
City Centre<br />
Lead Agencies:<br />
BCC (City <strong>Development</strong>)<br />
Colston Hall<br />
Legible City Initiative<br />
Improving visitors’ understanding and experience of the city through art, public realm and wayfinding improvements working to a unified<br />
design concept.<br />
Cost: Funding Sources: Phasing:<br />
Ongoing<br />
‐ <strong>Bristol</strong> City Council (funding agreed annually)<br />
Ongoing<br />
‐ Developer contributions<br />
Culture and Leisure <strong>Infrastructure</strong><br />
Desirable<br />
Risks:<br />
Contingencies:<br />
Relevant Policy Areas:<br />
Citywide<br />
Lead Agencies:<br />
BCC (City <strong>Development</strong>)<br />
‐ Page 39 of 41 ‐