19.05.2014 Views

Bristol Development Framework Infrastructure Delivery Programme

Bristol Development Framework Infrastructure Delivery Programme

Bristol Development Framework Infrastructure Delivery Programme

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix A: <strong>Infrastructure</strong> Schedule<br />

29 February 2012<br />

<strong>Bristol</strong> <strong>Development</strong> <strong>Framework</strong><br />

<strong>Infrastructure</strong> <strong>Delivery</strong> <strong>Programme</strong><br />

Park and Ride: A37<br />

New site to be confirmed.<br />

Transport <strong>Infrastructure</strong><br />

Desirable<br />

Cost: Funding Sources: Phasing:<br />

Not yet available<br />

‐To be confirmed<br />

Not yet available<br />

‐ Developer contributions<br />

Risks:<br />

Contingencies:<br />

Relevant Policy Areas:<br />

South <strong>Bristol</strong><br />

Outside <strong>Bristol</strong><br />

Lead Agencies:<br />

BCC (City <strong>Development</strong>)<br />

Bath and North East Somerset Council<br />

Reconfiguration of roads and junctions (South <strong>Bristol</strong>)<br />

Improving accessibility, connectivity and urban form and reducing severance.<br />

Transport <strong>Infrastructure</strong><br />

Desirable<br />

Cost: Funding Sources: Phasing:<br />

Will depend on the outcome of<br />

Not yet available<br />

masterplanning<br />

Risks:<br />

Contingencies:<br />

Relevant Policy Areas:<br />

South <strong>Bristol</strong><br />

Lead Agencies:<br />

BCC (City <strong>Development</strong>)<br />

‐ Page 14 of 41 ‐

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!