DESIGN CHARRETTE MODEL - CORRIDOR SCHEME<br />

THE MASTER PLANNING COMMITTEE TESTING DIFFERENT SCHEMES<br />

PROCESS<br />

Sasaki began working with PUC on a new<br />

<strong>Master</strong> <strong>Plan</strong> in the Fall of 2006. The master<br />

planning process was highly inclusive, with all<br />

members of the <strong>Calumet</strong> community asked<br />

to contribute. The process included several<br />

phases of work.<br />

First, the Sasaki team embarked on a massive<br />

data gathering phase, which included extended<br />

site visits, facility tours, and interviews with<br />

key stakeholders. The second phase of work<br />

involved the analysis and synthesis of this<br />

data. The analysis defined and quantified<br />

PUC’s changing institutional profile and<br />

related facility needs. It included academic,<br />

environmental, and student life components,<br />

and studied PUC’s relationships with its<br />

neighboring communities. Equipped with<br />

these findings, the Sasaki team worked with<br />

the master planning committee to define<br />

two broad alternative frameworks for future<br />

growth. These alternatives were explored<br />

in detail in an onsite design charrette<br />

using physical models to arrange alternate<br />

building schemes for campus development,<br />

examine where program components might<br />

be accommodated, and define <strong>University</strong><br />

priorities through various phasing schemes.<br />

The over-arching goals of the model exercise<br />

were to develop an integrated campus which<br />

efficiently used available space, and to<br />

detail a roadmap for development. The two<br />

alternatives were then synthesized into a<br />

preferred direction for the master plan. This<br />

preferred direction incorporated key elements<br />

from both alternative schemes. Finally,<br />

this preferred direction was investigated<br />

in depth. Utility requirements and cost<br />

projections were calculated. The final plan<br />

which emerged was an organic response<br />

both to the physical configuration of the<br />

campus site, the mission of the <strong>University</strong>,<br />

and its role as a citizen of Hammond. The<br />

plan is the work of the extended campus<br />

community, and of the <strong>Purdue</strong> <strong>University</strong><br />

system, and equips the <strong>University</strong> with<br />

a clear direction for future growth.<br />