Bicycle and Pedestrian Master Plan - sacog
Bicycle and Pedestrian Master Plan - sacog
Bicycle and Pedestrian Master Plan - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROJECT LIST<br />
ID COUNTY JURISDICTION PROJECT TYPE PROJECT LOCATION SEGMENT / DESCRIPTION EXISTING PLAN EST. COST<br />
Yolo County--City of West Sacramento<br />
50000 Yolo City of West Sacramento Class I Trail Rivers Trail ADA Improvements. Pavement of approximately 1 mile from<br />
Bryte Park naure trail to California Indian Heritage Center site.<br />
City of West Sacramento <strong>Bicycle</strong> & <strong>Pedestrian</strong> <strong>Master</strong> <strong>Plan</strong> <strong>and</strong><br />
Parks <strong>Master</strong> <strong>Plan</strong><br />
$1,500,000<br />
50001 Yolo City of West Sacramento & Class I Trail Yolo Causeway Reconstruct connection between I-80 Yolo Causeway <strong>and</strong> West<br />
$50,000<br />
Yolo County<br />
Capitol Ave.<br />
50002 Yolo City of West Sacramento Combined Projects 3rd Street UPRR Grade Crossing Improvements $250,000<br />
50003 Yolo City of West Sacramento <strong>Pedestrian</strong> Upgrade Linden Road Between Clarksburg Branch Line Trail <strong>and</strong> Stonegate Drive- City of West Sacramento <strong>Bicycle</strong> <strong>and</strong> <strong>Pedestrian</strong> Path <strong>Master</strong> <strong>Plan</strong> $370,000<br />
<strong>Pedestrian</strong> <strong>and</strong> <strong>Bicycle</strong> Gap Closure (near Our Lady of Grace<br />
ES)<br />
50004 Yolo City of West Sacramento Combined Projects Lower Northwest Interceptor alignment Class I along LNWI alignment from Yolo St. / Sacramento Ave.<br />
to Evergreen Ave. Includes grade-separated crossing of UPRR.<br />
$7,000,000<br />
50005 Yolo City of West Sacramento Combined Projects Westacre Road Class II <strong>and</strong> sidewalk both sides of Westacre Rd from West West Sacramento <strong>Bicycle</strong> <strong>and</strong> <strong>Pedestrian</strong> <strong>Master</strong> <strong>Plan</strong><br />
$5-6 mil<br />
Capitol Ave to Park Blvd<br />
50006 Yolo City of West Sacramento Class I Trail Main Drain Trail Creation of Class I one bikeway for approximately 4.5 miles City of West Sacramento <strong>Bicycle</strong> & <strong>Pedestrian</strong> <strong>Master</strong> <strong>Plan</strong> <strong>and</strong><br />
$5,000,000<br />
along main drain alignment from Barge Canal to Bevan Rd with Parks <strong>Master</strong> <strong>Plan</strong><br />
Southport Parkway connection.<br />
50007 Yolo City of West Sacramento Class I Trail South River Road From 8.4 mi south of Barge Canal to southern City limit- <strong>Bicycle</strong> City of West Sacramento <strong>Bicycle</strong> <strong>and</strong> <strong>Pedestrian</strong> Path <strong>Master</strong> <strong>Plan</strong> $2,000,000<br />
Corridor Improvements<br />
50008 Yolo City of West Sacramento <strong>Pedestrian</strong> Upgrade Higgins Road North side of Higgins Road, east of Summerfield Drive <strong>and</strong> west City of West Sacramento <strong>Bicycle</strong> <strong>and</strong> <strong>Pedestrian</strong> Path <strong>Master</strong> <strong>Plan</strong> $150,000<br />
of Constitution Ave./Hart Ave.--<strong>Pedestrian</strong> <strong>and</strong> <strong>Bicycle</strong> Gap<br />
Closure<br />
50009 Yolo City of West Sacramento & Class I Trail West Sacramento Riverside to Yolo Causeway Connector; Sacramento Ave/Reed City of West Sacramento <strong>Bicycle</strong> & <strong>Pedestrian</strong> <strong>Master</strong> <strong>Plan</strong> <strong>and</strong><br />
$1,500,000<br />
Yolo County<br />
Ave to Yolo Causeway<br />
Parks <strong>Master</strong> <strong>Plan</strong><br />
50010 Yolo City of West Sacramento Class I Trail Morton Canal From south of Violet Dr., Susan Ct., Phelps Ct., <strong>and</strong> Linden Rd.<br />
$500,000<br />
to Jefferson Blvd.<br />
50011 Yolo City of West Sacramento Class I Trail Pioneer Trail US50 Bridge to Jefferson Blvd.- <strong>Bicycle</strong> Corridor Improvements City of West Sacramento <strong>Bicycle</strong> <strong>and</strong> <strong>Pedestrian</strong> Path <strong>Master</strong> <strong>Plan</strong> $750,000<br />
50012 Yolo City of West Sacramento River Crossings I Street Bridge Bridge Railing Replacement $1,200,000<br />
Regional <strong>Bicycle</strong>, <strong>Pedestrian</strong> <strong>and</strong> Trails <strong>Master</strong> <strong>Plan</strong> Amended June 2011 B-82