25.06.2014 Views

Large investments in R & D – a continuous process - Scherdel GmbH

Large investments in R & D – a continuous process - Scherdel GmbH

Large investments in R & D – a continuous process - Scherdel GmbH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRODUCTS<br />

A 5-axis CNC mach<strong>in</strong><strong>in</strong>g ce<br />

VISION Spr<strong>in</strong>t of Reichenbacher Hamuel contributes<br />

MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />

The new millennium tower of St.<br />

Edmundsbury Cathedral<br />

T<br />

he company known as Taylor<br />

Made Jo<strong>in</strong>ery Interiors Ltd based<br />

<strong>in</strong> Suffolk <strong>in</strong> Brita<strong>in</strong> has the reputation<br />

of be<strong>in</strong>g a top-quality jo<strong>in</strong>ery manufacturer.<br />

A project consist<strong>in</strong>g of the design,<br />

manufacture and construction of a magnificent<br />

fan-vaulted ceil<strong>in</strong>g for the new<br />

tower of St. Edmundsbury Cathedral <strong>in</strong><br />

Bury St. Edmunds is caus<strong>in</strong>g a sensation<br />

among experts from the trade. The<br />

spectacular oak ceil<strong>in</strong>g, due to be completed<br />

<strong>in</strong> 2010, will be the "crown<strong>in</strong>g<br />

glory" for the gothic revival tower, built<br />

3-D visualization of the ornamental mach<strong>in</strong><strong>in</strong>g work<br />

as part of a millennium project. By us<strong>in</strong>g<br />

a 5-axis CNC mach<strong>in</strong><strong>in</strong>g centre<br />

from Reichenbacher Hamuel – a<br />

SCHERDEL subsidiary – TMJ Interiors<br />

ensured that the immense technical<br />

complexity of such a project could be<br />

mastered efficiently and cost-effectively.<br />

TMJ Interiors from the county of Suffolk<br />

has an impressive record of successful<br />

historic build<strong>in</strong>g projects. That's<br />

why this specialist company was chosen<br />

to carry out this major order. In<br />

April 2008 the design team first started<br />

work<strong>in</strong>g on the detail and structural elements<br />

of the ceil<strong>in</strong>g. A laser scan of the<br />

historic tower measured 29 million<br />

po<strong>in</strong>ts, which enabled designers to create<br />

an accurate model of the exist<strong>in</strong>g<br />

structure. The <strong>in</strong>formation collected was<br />

imported <strong>in</strong>to a 3-D computer software<br />

program by means of which extremely<br />

precise work<strong>in</strong>g draw<strong>in</strong>gs and, ultimately,<br />

five-axis tool-path draw<strong>in</strong>gs were<br />

produced.<br />

of the construction alone, the ceil<strong>in</strong>g<br />

was designed and manufactured <strong>in</strong><br />

over 2,500 <strong>in</strong>dividual pieces, with a total<br />

weight of more than five tonnes. The<br />

immense oak framework, consist<strong>in</strong>g of<br />

eight curved rib sections with a central<br />

circular assembly, was first erected at<br />

TMJ’s workshop. All the ornamental details<br />

were applied and the complete<br />

ceil<strong>in</strong>g was thus constructed prior to <strong>in</strong>stallation.<br />

In addition to be<strong>in</strong>g hardwear<strong>in</strong>g<br />

and durable, the wood used<br />

had to harmonize with the fabric of the<br />

build<strong>in</strong>g; for these reasons TMJ decided<br />

to use FSC European Oak obta<strong>in</strong>ed<br />

from susta<strong>in</strong>able sources.<br />

TMJ was only able to accept a challenge<br />

of this nature because it could rely<br />

on its own expertise <strong>in</strong> jo<strong>in</strong>ery and on<br />

the outstand<strong>in</strong>g accuracy and robustness<br />

of its CNC mach<strong>in</strong><strong>in</strong>g equipment.<br />

The components for the project were<br />

mach<strong>in</strong>ed with precision us<strong>in</strong>g a Reichenbacher<br />

Hamuel 5-axis CNC mach<strong>in</strong><strong>in</strong>g<br />

centre. To <strong>in</strong>crease the strength<br />

of the oak components as well as to<br />

m<strong>in</strong>imize waste, a lam<strong>in</strong>at<strong>in</strong>g <strong>process</strong><br />

was used, which <strong>in</strong>volved putt<strong>in</strong>g together<br />

layers of wood of various sizes<br />

to create suitable workpieces for mach<strong>in</strong><strong>in</strong>g.<br />

Manoeuvrability <strong>in</strong> three dimensions<br />

TMJ operates two Reichenbacher<br />

Hamuel 5-axis CNC mach<strong>in</strong><strong>in</strong>g centres:<br />

a Univers and a Vision Spr<strong>in</strong>t. It was<br />

decided to use only the Vision Spr<strong>in</strong>t for<br />

the complete manufacture of all the<br />

6<br />

A highly complex structure<br />

On account of the size and complexity<br />

David Clarke exam<strong>in</strong>es a component mach<strong>in</strong>ed<br />

on the 5-axis VISION Spr<strong>in</strong>t

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!