REPORTS ON RESEARCH AND DEVELOPMENT, MANUFACTURING, MATERIAL TECHNOLOGY AND THE PRACTICAL APPLICA-<br />
TIONS OF ENGINEERING SPRINGS AND ON THE SYSTEMS, MACHINERY AND TOOLING DIVISIONS OF THE SCHERDELGROUP<br />
Dear reader,<br />
It seems that companies have only<br />
just recovered from last year's crisis<br />
when they are hav<strong>in</strong>g to face the next<br />
trial – this time caused by the high level<br />
of debts <strong>in</strong>curred by the European<br />
states and the unbridled speculative<br />
activities of the f<strong>in</strong>ancial sector.<br />
Aga<strong>in</strong>st this background, the future development<br />
of the worldwide economic<br />
situation is still extremely uncerta<strong>in</strong>.<br />
Admittedly, the companies <strong>in</strong> the<br />
SCHERDELGroup are pleased to note<br />
a positive trend as far as the level of<br />
<strong>in</strong>com<strong>in</strong>g orders is concerned. Here,<br />
we are aga<strong>in</strong> approach<strong>in</strong>g the outstand<strong>in</strong>g<br />
results obta<strong>in</strong>ed dur<strong>in</strong>g the<br />
first half of 2008. However, we don't<br />
know how long this trend will last. We<br />
are very concerned about the fact that,<br />
particularly <strong>in</strong> Germany, the prices for<br />
raw materials are constantly ris<strong>in</strong>g. Although<br />
the manufacturers have already<br />
set the prices for materials at<br />
the same level as just before the start<br />
of the economic crisis <strong>in</strong> 2008, it is evident<br />
from negotiations that these<br />
prices may rise even further. There<br />
may also be problems <strong>in</strong> obta<strong>in</strong><strong>in</strong>g<br />
supplies of steel. One of our particular<br />
strong po<strong>in</strong>ts is our great potential <strong>in</strong><br />
the field of research and development.<br />
This is currently evident <strong>in</strong> the work relat<strong>in</strong>g<br />
to future developments which, to<br />
a large extent, will provide a replacement<br />
for the combustion eng<strong>in</strong>e. The<br />
fact that, from a f<strong>in</strong>ancial po<strong>in</strong>t of view<br />
as well, an <strong>in</strong>creas<strong>in</strong>g number of customers<br />
would also like their suppliers<br />
to carry out the development work,<br />
presents us with a great challenge. In<br />
the future too, thanks to our team of<br />
experts, our aim is to provide you with<br />
a reliable partner <strong>in</strong> the field of <strong>in</strong>novation.<br />
Walter Bach<br />
Group Manag<strong>in</strong>g Director<br />
<strong>Large</strong> <strong><strong>in</strong>vestments</strong> <strong>in</strong> R & D –<br />
a cont<strong>in</strong>uous <strong>process</strong><br />
Product development at SCHERDEL –<br />
a customer service for many trades<br />
SCHERDEL's worldwide activities <strong>in</strong><br />
the field of research and product<br />
development are directed centrally from<br />
the SCHERDEL company known as<br />
INNOTEC Forschungs- und Entwicklungs-<strong>GmbH</strong><br />
located at Marktredwitz<br />
and Poppenreuth <strong>in</strong> north-eastern<br />
Bavaria near the border with the Czech<br />
Republic. This company directs the activities<br />
relat<strong>in</strong>g to the development of<br />
new products at what are known as the<br />
"application locations" at Friedau,<br />
Seifhennersdorf and Marienberg <strong>in</strong><br />
Germany, Beauvais and L'Arbresle <strong>in</strong><br />
France, Muskegon <strong>in</strong> the USA and<br />
Shanghai <strong>in</strong> Ch<strong>in</strong>a. Depend<strong>in</strong>g on the<br />
requirements and the degree of difficulty<br />
<strong>in</strong>volved, the development projects<br />
start dur<strong>in</strong>g a period rang<strong>in</strong>g from six<br />
months to four years before the beg<strong>in</strong>n<strong>in</strong>g<br />
of series production. Dur<strong>in</strong>g the<br />
development phase, SCHERDEL is not<br />
only concerned with <strong>process</strong>es for optimiz<strong>in</strong>g<br />
spr<strong>in</strong>gs and components but, at<br />
an early stage, we visit the premises of<br />
the companies supply<strong>in</strong>g the raw materials<br />
<strong>in</strong> order to optimize these materials<br />
with regard to their subsequent use.<br />
At the same time, to satisfy the demands<br />
made by <strong>in</strong>dustry, we make a<br />
constant endeavour to shorten the<br />
product development times. Here, the<br />
company known as SIMENT <strong>GmbH</strong><br />
(see the article on page 8) uses technologies<br />
such as F<strong>in</strong>ite Element Calculation,<br />
Multibody Simulation or Crash<br />
Simulation. The next stage <strong>in</strong> the development<br />
<strong>process</strong> is the production of<br />
the necessary prototypes by the<br />
Group's own Prototype Shop. Basically,<br />
product development is very much an<br />
application-oriented <strong>process</strong>. Teams<br />
consist<strong>in</strong>g of eng<strong>in</strong>eers and applicationtechnology<br />
specialists make use of<br />
their complex, expert knowledge relat<strong>in</strong>g<br />
to valve tra<strong>in</strong>, powertra<strong>in</strong> and auxiliary<br />
units, steer<strong>in</strong>g and brake systems,<br />
vehicle-body and open<strong>in</strong>g systems, vehicle<br />
<strong>in</strong>terior, as well as hybrid technology<br />
and electromobility. In addition to<br />
work<strong>in</strong>g out solutions for the automotive<br />
<strong>in</strong>dustry, the development work<br />
concentrates on areas such as medical<br />
technology, the manufacture of recreational<br />
and sports equipment, energy<br />
technology and also the "white goods"<br />
<strong>in</strong>dustry <strong>in</strong>volv<strong>in</strong>g the manufacture of<br />
electrical appliances. SCHERDEL <strong>in</strong>vests<br />
about six per cent of its total<br />
turnover annually <strong>in</strong> product development<br />
– even <strong>in</strong> years of crisis such as<br />
2009. The Group aims to extend its <strong>in</strong>novative<br />
capacity and efficient customer<br />
service still further.<br />
(tr/dk)<br />
1<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION EDITION 1/2010 E
COMPANY NEWS<br />
Staff profile<br />
We'd like to <strong>in</strong>troduce staff members<br />
to you who will act as your<br />
contact if required.<br />
Motor rac<strong>in</strong>g – a driv<strong>in</strong>g for<br />
In many vehicles SCHERDEL components are part<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />
2<br />
Olaf Korf, graduate <strong>in</strong> physics<br />
and Head of the Department<br />
of Purchas<strong>in</strong>g and Materials<br />
Management<br />
S<strong>in</strong>ce the beg<strong>in</strong>n<strong>in</strong>g of the year<br />
Mr Olaf Korf has been <strong>in</strong> charge of<br />
the Department of Purchas<strong>in</strong>g and<br />
Materials Management for the<br />
whole SCHERDELGroup.<br />
Mr Korf studied physics and<br />
bus<strong>in</strong>ess economics at the University<br />
of Bayreuth. After pass<strong>in</strong>g the<br />
f<strong>in</strong>al State exam<strong>in</strong>ation <strong>in</strong> military<br />
eng<strong>in</strong>eer<strong>in</strong>g he began work<strong>in</strong>g as<br />
a civil servant with the Federal<br />
Office for Military Eng<strong>in</strong>eer<strong>in</strong>g and<br />
Procurement. Now 38 years old,<br />
he started work<strong>in</strong>g for SCHERDEL<br />
<strong>in</strong> 2003. As an assistant to the<br />
Group Manag<strong>in</strong>g Director he soon<br />
acquired an extensive knowledge<br />
of the organization and procedures<br />
with<strong>in</strong> the SCHERDEL-<br />
Group and he then occupied<br />
various positions at the Group's<br />
locations <strong>in</strong> France. Here Mr Korf<br />
devoted his efforts to staff development,<br />
the organization of sales<br />
and technology, and <strong>process</strong> optimization<br />
regard<strong>in</strong>g production.<br />
One particularly important aspect<br />
of these activities was to make<br />
use of synergy effects with<strong>in</strong> the<br />
French factories and to <strong>in</strong>tegrate<br />
them <strong>in</strong>to the Group.<br />
Some of the most important<br />
tasks of the new Head of the Purchas<strong>in</strong>g<br />
Department now <strong>in</strong>clude<br />
the coord<strong>in</strong>ation of SCHERDEL's<br />
purchas<strong>in</strong>g activities worldwide,<br />
the sett<strong>in</strong>g up of a supplier management<br />
scheme for the whole<br />
Group, the further development of<br />
the procurement strategy and the<br />
optimization and standardization<br />
of the procurement <strong>process</strong>.<br />
Mr Korf is married and has three<br />
children. As a former marathon<br />
runner, he is still an enthusiastic<br />
and ambitious participant <strong>in</strong> endurance<br />
sports.<br />
I<br />
n no other field is the pioneer<strong>in</strong>g<br />
spirit so active and of such practical<br />
use as <strong>in</strong> motor rac<strong>in</strong>g. Creativity and a<br />
capacity for enthusiasm, coupled with a<br />
fair amount of know-how, experience,<br />
endurance and a talent for improvis<strong>in</strong>g<br />
as well – these are the qualities which<br />
characterize the world's best rac<strong>in</strong>g<br />
teams. An environment which demands<br />
speed and flexibility from all those <strong>in</strong>volved.<br />
The SCHERDELGroup, as a<br />
supplier to the sport of motor rac<strong>in</strong>g,<br />
readily accepts such challenges. And<br />
this has been the case for a long time<br />
now. For many decades SCHERDEL<br />
products have been contribut<strong>in</strong>g to the<br />
success of rac<strong>in</strong>g drivers on courses,<br />
tracks and circuits worldwide. And so,<br />
<strong>in</strong>directly, the Group is part of every<br />
w<strong>in</strong>n<strong>in</strong>g team. This success is the result<br />
of a long and sometimes difficult development<br />
<strong>process</strong>. One important reason<br />
for SCHERDEL's great efforts <strong>in</strong> relation<br />
to this sport is the fact that Mr Walter<br />
Bach, the Group Manag<strong>in</strong>g Director,<br />
is an enthusiastic supporter of motor<br />
rac<strong>in</strong>g.<br />
Of course we take a certa<strong>in</strong> amount of<br />
pride <strong>in</strong> the fact that, for a long time<br />
now, some of the most important rac<strong>in</strong>g<br />
events have been won by cars fitted<br />
with SCHERDEL products such as the<br />
valve spr<strong>in</strong>g. One great success here<br />
and a special highlight was <strong>in</strong> 1983<br />
when Nelson Piquet won the Formula 1<br />
World Championship driv<strong>in</strong>g a Brabham<br />
BMW BT52 whose eng<strong>in</strong>e was<br />
equipped with SCHERDEL valve<br />
spr<strong>in</strong>gs. In 2006 there was an equally<br />
excit<strong>in</strong>g event when the Audi R10 TDI –<br />
also fitted with valve spr<strong>in</strong>gs made by<br />
SCHERDEL won at Le Mans, the classic<br />
long-distance race. Other successes<br />
(past and present) with our valve<br />
spr<strong>in</strong>gs <strong>in</strong>clude DTM, WTCC, WRC and<br />
GT events – <strong>in</strong> motor rac<strong>in</strong>g and motorbike<br />
rac<strong>in</strong>g, such as the Speedway, for<br />
example. The list could be extended by<br />
any number of races and, hopefully, it<br />
will become even longer.<br />
For decades, w<strong>in</strong>s at <strong>in</strong>ternational motor-rac<strong>in</strong>g events have always meant success for products made<br />
by SCHERDEL as well. Development work carried out for motor rac<strong>in</strong>g is often <strong>in</strong>corporated <strong>in</strong> the series<br />
production of vehicles for everyday use.<br />
It's fasc<strong>in</strong>at<strong>in</strong>g to consider the development<br />
from the first heavy-fuel eng<strong>in</strong>e<br />
of Rudolf Diesel (1893) to the world's<br />
first diesel eng<strong>in</strong>e which won the classic<br />
long-distance race at Le Mans <strong>in</strong><br />
2006. Both eng<strong>in</strong>es benefited from the<br />
reliable operation of valve spr<strong>in</strong>gs made<br />
by SCHERDEL. A pioneer<strong>in</strong>g spirit and<br />
the extreme demands of motor rac<strong>in</strong>g<br />
form a symbiosis which results <strong>in</strong> success.<br />
The Group is committed to produc<strong>in</strong>g<br />
first-rate quality at all times – not<br />
only as a supplier of products but as a<br />
development partner with an extensive<br />
range of activities <strong>in</strong> the development of<br />
materials, the development of products<br />
and their manufactur<strong>in</strong>g <strong>process</strong>es.<br />
SCHERDEL's activities also <strong>in</strong>clude<br />
surface coat<strong>in</strong>g procedures and the<br />
Group has its own Mach<strong>in</strong>es and Systems<br />
Division. If required, customers<br />
can obta<strong>in</strong> not only a particular component<br />
but also the appropriate assembly<br />
units.<br />
Thanks to the Group's extensive development<br />
activities SCHERDEL has, <strong>in</strong><br />
some cases, been able to <strong>in</strong>corporate<br />
<strong>in</strong> the production <strong>process</strong> for motor rac<strong>in</strong>g<br />
special measures which ensure that<br />
all the components survive the distance<br />
required for the race without damage.
ce of the pioneer<strong>in</strong>g spirit<br />
of the w<strong>in</strong>n<strong>in</strong>g team<br />
Contact data<br />
For many years SCHERDEL valve spr<strong>in</strong>gs have been part of the w<strong>in</strong>n<strong>in</strong>g team at the famous Le Mans<br />
race. The most recent example is the triple w<strong>in</strong> for the Audi-R15-TDI <strong>in</strong> June 2010. (Photos: Audi)<br />
Even if, <strong>in</strong> relation to bus<strong>in</strong>ess operations,<br />
these measures are not so important<br />
<strong>in</strong> view of the small number of<br />
parts required for motor rac<strong>in</strong>g, we nevertheless<br />
regard it as a challenge that<br />
only first-rate components should be<br />
SCHERDEL components also<br />
<strong>in</strong> the new gull-w<strong>in</strong>g-door car<br />
The new SLS AMG, a really super<br />
sports car made by Mercedes Benz,<br />
makes the hearts of car fans all over<br />
the world beat faster. The gull-w<strong>in</strong>gdoor<br />
car is a highly successful revival<br />
of the old Mercedes 300 SL which was<br />
presented to the public for the first time<br />
<strong>in</strong> February 1954 at the International<br />
Motor Sports Show <strong>in</strong> New York. The<br />
vehicle was built between 1954 and<br />
1957 as a coupé and, on account of its<br />
elegant, sporty design and its unmistakable<br />
gull-w<strong>in</strong>g doors it was regarded<br />
supplied for this activity. After all, peak<br />
performance and a knowledge of what<br />
is technically feasible provide an outstand<strong>in</strong>g<br />
basis for the manufacture of<br />
"normal" series products.<br />
(ab)<br />
for decades as a classic with cult status.<br />
Between 1957 and 1963 there was<br />
also a roadster version. In 1999 the<br />
"old" Mercedes 300 SL was chosen by<br />
the German old-timer magaz<strong>in</strong>e "Motor<br />
Klassik" as the sports car of the century.<br />
The new SLS AMG is impressive<br />
not only because of its classic design<br />
but also because it weighs only 1620<br />
kilograms, its chassis and bodywork<br />
be<strong>in</strong>g made completely of alum<strong>in</strong>ium.<br />
At SCHERDEL we are proud of the fact<br />
that today, after more than 50 years,<br />
we still act as a supplier for this noble<br />
make of car.<br />
(dk)<br />
SCHERDEL<br />
<strong>Scherdel</strong>straße 2<br />
D-95615 Marktredwitz<br />
Germany<br />
Albrecht Busse,<br />
graduate eng<strong>in</strong>eer<br />
Tel. +49 9231 603-537<br />
e-mail:<br />
albrecht.busse@scherdel.de<br />
The gull-w<strong>in</strong>g doors of the new<br />
SLS AMG open elegantly thanks to<br />
SCHERDEL technology.<br />
3<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION
PRODUCTS<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />
The top priority:<br />
Resistance under<br />
service conditions<br />
With an annual production of up<br />
to 200 million parts, a valve<br />
spr<strong>in</strong>g <strong>in</strong> a modern car eng<strong>in</strong>e<br />
must be of a constantly high<br />
quality <strong>in</strong> order to be able to meet<br />
the demands of the dynamics<br />
and to ensure the durability required<br />
by approx. a thousand<br />
million cycles without break<strong>in</strong>g<br />
and with a m<strong>in</strong>imum of relaxation.<br />
In the case of lorry eng<strong>in</strong>es, the<br />
demands perta<strong>in</strong><strong>in</strong>g to durability<br />
are similar. Here, although the<br />
dynamic stress on the valve<br />
spr<strong>in</strong>g is less, the factor of<br />
mechanical wear presents a<br />
challenge. Of course, <strong>in</strong> the case<br />
of eng<strong>in</strong>e construction for lorries<br />
too, the valve spr<strong>in</strong>gs must be of<br />
a constantly high quality, even <strong>in</strong><br />
the case of small or mediumsized<br />
batches.<br />
The requirement for a high resistance<br />
under service conditions<br />
is extremely important <strong>in</strong> the case<br />
of applications such as shipbuild<strong>in</strong>g<br />
or for stationary eng<strong>in</strong>es as <strong>in</strong><br />
block-type thermal power stations:<br />
here, a breakdown with the<br />
accompany<strong>in</strong>g downtime could<br />
entail enormous costs.<br />
Valve spr<strong>in</strong>gs for motorbike eng<strong>in</strong>es<br />
present a completely different<br />
challenge. On account of the<br />
high eng<strong>in</strong>e speed of over 14,000<br />
r.p.m. dynamic effects are very<br />
clearly noticeable. This requires<br />
special production <strong>process</strong>es<br />
which guarantee the reliability of<br />
the component. These <strong>process</strong>es<br />
are very often derived from the<br />
even greater demands which<br />
motor rac<strong>in</strong>g makes on valve<br />
spr<strong>in</strong>gs.<br />
(jh)<br />
Contact data<br />
SCHERDEL<br />
<strong>Scherdel</strong>straße 2<br />
D-95615 Marktredwitz<br />
Germany<br />
SCHERDEL valve spr<strong>in</strong>gs –<br />
In-house mach<strong>in</strong>e construction and expertise relati<br />
Valve spr<strong>in</strong>gs are optimized for every eng<strong>in</strong>e<br />
S<br />
<strong>in</strong>ce the requirements for valve<br />
spr<strong>in</strong>gs vary <strong>in</strong> accordance with<br />
their respective applications, at a very<br />
early stage SCHERDEL began to construct<br />
the necessary production equipment<br />
with its own mach<strong>in</strong>ery division.<br />
This mach<strong>in</strong>ery is <strong>in</strong>dividually designed<br />
to suit the respective requirements of<br />
the valve spr<strong>in</strong>gs. In the course of time<br />
each stage of the <strong>process</strong> (coil<strong>in</strong>g, temper<strong>in</strong>g,<br />
gr<strong>in</strong>d<strong>in</strong>g, deburr<strong>in</strong>g, shot peen<strong>in</strong>g,<br />
colour mark<strong>in</strong>g, hot sett<strong>in</strong>g, onehundred-percent<br />
<strong>in</strong>spection, preservation)<br />
benefited from the extensive<br />
knowledge of the spr<strong>in</strong>g specialists,<br />
knowledge which was also used <strong>in</strong> the<br />
design and construction of the relevant<br />
mach<strong>in</strong>ery. This ensures that the special<br />
requirements relat<strong>in</strong>g to the number<br />
of pieces produced or technical parameters<br />
are met. Another advantage of<br />
the <strong>in</strong>terdepartmental transfer of knowledge<br />
from spr<strong>in</strong>g manufacture to the<br />
construction of mach<strong>in</strong>ery consists <strong>in</strong><br />
the fact that, for example, special solutions<br />
such as one hundred-percent<br />
squareness control, measurement of<br />
natural frequency or special identification<br />
mark<strong>in</strong>gs on a particular side of the<br />
spr<strong>in</strong>g (over the whole surface or <strong>in</strong> the<br />
form of a bar code) can be adapted to<br />
suit the respective production l<strong>in</strong>e.<br />
Thanks to the flexibility of its <strong>in</strong>stallations,<br />
SCHERDEL can manufacture<br />
valve spr<strong>in</strong>gs of a constantly high quality<br />
for all the requirements described.<br />
Here it makes no difference whether<br />
the requirement is just for small batches<br />
or for 20 million pieces of a particular<br />
item per year; whether, as <strong>in</strong> motor<br />
rac<strong>in</strong>g, the valve spr<strong>in</strong>gs just have to<br />
survive for a few hours without a breakdown<br />
or whether they have to ensure<br />
that an eng<strong>in</strong>e functions for decades.<br />
Scientific advisory service for<br />
manufacturers of materials<br />
In order to achieve the ambitious aim<br />
of offer<strong>in</strong>g as wide a range as possible<br />
<strong>in</strong> relation to product development, you<br />
require not only outstand<strong>in</strong>g production<br />
technology but also an extensive knowledge<br />
of the materials used. That's why<br />
SCHERDEL's rout<strong>in</strong>e activities <strong>in</strong>clude<br />
the provision of steel manufacturers<br />
and wire drawers with suitable methods<br />
of test<strong>in</strong>g and a scientific advisory service<br />
aimed at improv<strong>in</strong>g the quality of<br />
the materials. As a result, the Group<br />
has succeeded <strong>in</strong> obta<strong>in</strong><strong>in</strong>g releases for<br />
<strong>in</strong>ternational material suppliers from its<br />
end-customers, on the one hand to ensure<br />
more competition and on the other<br />
to reduce the effects of exchange-rate<br />
fluctuations when purchas<strong>in</strong>g <strong>in</strong> the<br />
global market.<br />
4<br />
Jürgen Hartmann<br />
Tel. +49 9231 603-521<br />
e-mail:<br />
juergen.hartmann@scherdel.de
a first-rate product worldwide<br />
ng to materials result <strong>in</strong> top quality –<br />
Thanks to an expert knowledge of the<br />
resistance under service conditions of<br />
the different comb<strong>in</strong>ations of the available<br />
types of steel and of the various<br />
production <strong>process</strong>es used by<br />
SCHERDEL, it is possible by us<strong>in</strong>g optimized<br />
production parameters (e.g.<br />
SCHERDEL SOF) to employ cost-effective<br />
solutions <strong>in</strong>stead of a more expensive<br />
material. SCHERDEL acquired this<br />
knowledge by carry<strong>in</strong>g out service-life<br />
tests us<strong>in</strong>g cycle testers which were developed<br />
and built <strong>in</strong>-house.<br />
For this purpose, however, at each production<br />
stage you also have to know<br />
what residual stress arises <strong>in</strong> a spr<strong>in</strong>g, to<br />
be able to measure this stress and to<br />
exert a positive <strong>in</strong>fluence on the stress<br />
at the respective production stage. In<br />
addition to the simulation of all the<br />
<strong>process</strong> stages by means of FEM calculation,<br />
at SCHERDEL the residual stress<br />
<strong>in</strong> a valve spr<strong>in</strong>g can also be determ<strong>in</strong>ed<br />
by means of X-ray diffractometry. This<br />
ensures that feedback to the respective<br />
production stage is always possible. Us<strong>in</strong>g<br />
a scann<strong>in</strong>g electron microscope,<br />
SCHERDEL also has the possibility of<br />
f<strong>in</strong>d<strong>in</strong>g out the reason for the failure of<br />
valve spr<strong>in</strong>gs and, accord<strong>in</strong>g to the case<br />
<strong>in</strong> question, can then support the wireor<br />
steel-manufacturer <strong>in</strong> the further development<br />
of the production <strong>process</strong>es.<br />
Cost sav<strong>in</strong>g thanks to state-ofthe-art<br />
calculation programs<br />
Prior to series production of a valve<br />
spr<strong>in</strong>g and tak<strong>in</strong>g the technical standards<br />
provided by the eng<strong>in</strong>e manufacturer<br />
<strong>in</strong>to consideration, SCHERDEL uses<br />
calculation programs which have<br />
been developed <strong>in</strong>-house to work out<br />
proposals for valve spr<strong>in</strong>gs. Depend<strong>in</strong>g<br />
on the respective requirement these are<br />
fitted with damp<strong>in</strong>g coils <strong>in</strong> a l<strong>in</strong>ear or<br />
progressive design. In addition to all the<br />
possible shapes of spr<strong>in</strong>gs (cyl<strong>in</strong>drical,<br />
conical, beehive-shaped), various different<br />
wire cross sections <strong>in</strong>clud<strong>in</strong>g round<br />
wire, elliptical wire and multi-arc variants<br />
are used.<br />
In order to save on development work<br />
and thus on costs as well, the dynamic<br />
prelim<strong>in</strong>ary calculation method (multibody<br />
simulation) is be<strong>in</strong>g used to an <strong>in</strong>creas<strong>in</strong>g<br />
extent <strong>in</strong> the development of<br />
valve spr<strong>in</strong>gs. As a result, variants which<br />
are less suitable <strong>in</strong> relation to dynamics<br />
can be excluded before the production<br />
of test specimens. As soon as the first<br />
prototypes are available SCHERDEL is<br />
able to measure <strong>in</strong> a cyl<strong>in</strong>der head driven<br />
by an electromotor the dynamic<br />
characteristics of valve spr<strong>in</strong>gs to which<br />
stra<strong>in</strong> gauges are attached. These tests<br />
are carried out <strong>in</strong> our <strong>in</strong>-house test<strong>in</strong>g<br />
shop. Us<strong>in</strong>g the results obta<strong>in</strong>ed, it is<br />
possible to assess not only the torsional<br />
stress, which is crucial for the durability<br />
of the valve spr<strong>in</strong>g, but also the bear<strong>in</strong>g<br />
pressure exerted under the valve spr<strong>in</strong>g<br />
as well as the valve lift and the valve<br />
speed throughout the required r.p.m.<br />
range. This helps the eng<strong>in</strong>e manufacturer<br />
to decide whether the valve spr<strong>in</strong>g<br />
is suitable for additional tests <strong>in</strong> the eng<strong>in</strong>e.<br />
Maximum resistance under service<br />
conditions<br />
Even Rudolf Diesel<br />
relied on SCHERDEL<br />
"Progress based on tradition"<br />
– this motto from SCHERDEL's<br />
corporate philosophy is particularly<br />
evident <strong>in</strong> the Group's long<br />
years of experience <strong>in</strong> the production<br />
of valve spr<strong>in</strong>gs. Thus<br />
SCHERDEL played a part <strong>in</strong> the<br />
design and construction of the<br />
world's first diesel eng<strong>in</strong>e by<br />
Rudolf Diesel <strong>in</strong> 1893 by supply<strong>in</strong>g<br />
valve spr<strong>in</strong>gs, and over a period<br />
of almost 120 years the<br />
Group has become one of the<br />
lead<strong>in</strong>g <strong>in</strong>ternational manufacturers<br />
of valve spr<strong>in</strong>gs, with an expert<br />
knowledge of all aspects of<br />
their use. Throughout this long<br />
period, the pioneer<strong>in</strong>g spirit of<br />
the eng<strong>in</strong>eers and technicians<br />
was always a driv<strong>in</strong>g force beh<strong>in</strong>d<br />
the progress <strong>in</strong> this field:<br />
for example, as early as 1936<br />
SCHERDEL was the first <strong>in</strong> the<br />
whole of Europe to use the shotpeen<strong>in</strong>g<br />
<strong>process</strong> to improve the<br />
service life of spr<strong>in</strong>gs.<br />
At its locations <strong>in</strong> Marktredwitz (Germany),<br />
Beauvais (France) and Anq<strong>in</strong>g<br />
(Ch<strong>in</strong>a), SCHERDEL currently produces<br />
approx. 200 million valve spr<strong>in</strong>gs annually<br />
for locally and <strong>in</strong>ternationally active<br />
eng<strong>in</strong>e manufacturers. Here, the failure<br />
rate <strong>in</strong> the field is less than 0.1 ppm. On<br />
account of its extensive expertise relat<strong>in</strong>g<br />
to spr<strong>in</strong>g calculation, basic materials,<br />
production <strong>process</strong>es and test<strong>in</strong>g methods,<br />
SCHERDEL is the top provider of<br />
an <strong>in</strong>tegrated valve-spr<strong>in</strong>g development<br />
service worldwide. (jh) 5<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION
PRODUCTS<br />
A 5-axis CNC mach<strong>in</strong><strong>in</strong>g ce<br />
VISION Spr<strong>in</strong>t of Reichenbacher Hamuel contributes<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />
The new millennium tower of St.<br />
Edmundsbury Cathedral<br />
T<br />
he company known as Taylor<br />
Made Jo<strong>in</strong>ery Interiors Ltd based<br />
<strong>in</strong> Suffolk <strong>in</strong> Brita<strong>in</strong> has the reputation<br />
of be<strong>in</strong>g a top-quality jo<strong>in</strong>ery manufacturer.<br />
A project consist<strong>in</strong>g of the design,<br />
manufacture and construction of a magnificent<br />
fan-vaulted ceil<strong>in</strong>g for the new<br />
tower of St. Edmundsbury Cathedral <strong>in</strong><br />
Bury St. Edmunds is caus<strong>in</strong>g a sensation<br />
among experts from the trade. The<br />
spectacular oak ceil<strong>in</strong>g, due to be completed<br />
<strong>in</strong> 2010, will be the "crown<strong>in</strong>g<br />
glory" for the gothic revival tower, built<br />
3-D visualization of the ornamental mach<strong>in</strong><strong>in</strong>g work<br />
as part of a millennium project. By us<strong>in</strong>g<br />
a 5-axis CNC mach<strong>in</strong><strong>in</strong>g centre<br />
from Reichenbacher Hamuel – a<br />
SCHERDEL subsidiary – TMJ Interiors<br />
ensured that the immense technical<br />
complexity of such a project could be<br />
mastered efficiently and cost-effectively.<br />
TMJ Interiors from the county of Suffolk<br />
has an impressive record of successful<br />
historic build<strong>in</strong>g projects. That's<br />
why this specialist company was chosen<br />
to carry out this major order. In<br />
April 2008 the design team first started<br />
work<strong>in</strong>g on the detail and structural elements<br />
of the ceil<strong>in</strong>g. A laser scan of the<br />
historic tower measured 29 million<br />
po<strong>in</strong>ts, which enabled designers to create<br />
an accurate model of the exist<strong>in</strong>g<br />
structure. The <strong>in</strong>formation collected was<br />
imported <strong>in</strong>to a 3-D computer software<br />
program by means of which extremely<br />
precise work<strong>in</strong>g draw<strong>in</strong>gs and, ultimately,<br />
five-axis tool-path draw<strong>in</strong>gs were<br />
produced.<br />
of the construction alone, the ceil<strong>in</strong>g<br />
was designed and manufactured <strong>in</strong><br />
over 2,500 <strong>in</strong>dividual pieces, with a total<br />
weight of more than five tonnes. The<br />
immense oak framework, consist<strong>in</strong>g of<br />
eight curved rib sections with a central<br />
circular assembly, was first erected at<br />
TMJ’s workshop. All the ornamental details<br />
were applied and the complete<br />
ceil<strong>in</strong>g was thus constructed prior to <strong>in</strong>stallation.<br />
In addition to be<strong>in</strong>g hardwear<strong>in</strong>g<br />
and durable, the wood used<br />
had to harmonize with the fabric of the<br />
build<strong>in</strong>g; for these reasons TMJ decided<br />
to use FSC European Oak obta<strong>in</strong>ed<br />
from susta<strong>in</strong>able sources.<br />
TMJ was only able to accept a challenge<br />
of this nature because it could rely<br />
on its own expertise <strong>in</strong> jo<strong>in</strong>ery and on<br />
the outstand<strong>in</strong>g accuracy and robustness<br />
of its CNC mach<strong>in</strong><strong>in</strong>g equipment.<br />
The components for the project were<br />
mach<strong>in</strong>ed with precision us<strong>in</strong>g a Reichenbacher<br />
Hamuel 5-axis CNC mach<strong>in</strong><strong>in</strong>g<br />
centre. To <strong>in</strong>crease the strength<br />
of the oak components as well as to<br />
m<strong>in</strong>imize waste, a lam<strong>in</strong>at<strong>in</strong>g <strong>process</strong><br />
was used, which <strong>in</strong>volved putt<strong>in</strong>g together<br />
layers of wood of various sizes<br />
to create suitable workpieces for mach<strong>in</strong><strong>in</strong>g.<br />
Manoeuvrability <strong>in</strong> three dimensions<br />
TMJ operates two Reichenbacher<br />
Hamuel 5-axis CNC mach<strong>in</strong><strong>in</strong>g centres:<br />
a Univers and a Vision Spr<strong>in</strong>t. It was<br />
decided to use only the Vision Spr<strong>in</strong>t for<br />
the complete manufacture of all the<br />
6<br />
A highly complex structure<br />
On account of the size and complexity<br />
David Clarke exam<strong>in</strong>es a component mach<strong>in</strong>ed<br />
on the 5-axis VISION Spr<strong>in</strong>t
ntre creates a piece of history<br />
to a cost-optimized manufacture of a magnificent fan-vaulted ceil<strong>in</strong>g<br />
components with just some detailed<br />
work and the f<strong>in</strong>al assembly be<strong>in</strong>g carried<br />
out by hand. David Clarke, TMJ’s<br />
CNC specialist, who worked out parametric<br />
programmes for each component,<br />
said: ‘‘The Vision Spr<strong>in</strong>t has<br />
tremendous manoeuvrability <strong>in</strong> three<br />
dimensions and is able to mach<strong>in</strong>e the<br />
most complex components. Even large<br />
pieces with double curvatures and extremely<br />
small radii are no problem for<br />
the Vision. S<strong>in</strong>ce 'all-round’ mach<strong>in</strong><strong>in</strong>g<br />
was necessary, we had to make jigs <strong>in</strong><br />
plywood or MDF for every s<strong>in</strong>gle component<br />
and, after carefully not<strong>in</strong>g the<br />
gra<strong>in</strong> of the oak, we plotted optimum<br />
Mach<strong>in</strong><strong>in</strong>g of a frame with double curvature and a length of 2.8 m<br />
cutt<strong>in</strong>g paths and selected the best<br />
possible tools.”<br />
The 5-axis Vision Spr<strong>in</strong>t is equipped<br />
with two rotary axes <strong>in</strong>cl<strong>in</strong>ed at 45 degrees<br />
to each other and optimized so<br />
that their centre axes <strong>in</strong>tersect at the<br />
work<strong>in</strong>g po<strong>in</strong>t of the tool. This means<br />
that highly efficient three-axis mach<strong>in</strong><strong>in</strong>g<br />
is achieved with fewer <strong>in</strong>terpolated<br />
movements. The quality of the workmanship<br />
and the accuracy of all the<br />
ceil<strong>in</strong>g elements was first class and this<br />
was evident when the ceil<strong>in</strong>g was constructed<br />
<strong>in</strong> the workshop – all the fixtures<br />
were at the correct angle and<br />
everyth<strong>in</strong>g fitted together perfectly. The<br />
whole structure was then dismantled,<br />
transported to the Cathedral, and hoisted<br />
to a height of over 30 metres for <strong>in</strong>stallation<br />
<strong>in</strong> the tower. After completion,<br />
the vaulted ceil<strong>in</strong>g will be gilded and<br />
pa<strong>in</strong>ted <strong>in</strong> blue, green and red.<br />
With regard to the project, the cofounder<br />
and Manag<strong>in</strong>g Director of TMJ<br />
Interiors, James Taylor said: “This is a<br />
perfect example of the co-operation between<br />
Reichenbacher CNC technology<br />
and traditional craftsmen which has<br />
produced a breathtak<strong>in</strong>g masterpiece.<br />
We know that we are help<strong>in</strong>g to create<br />
a piece of history and are immensely<br />
proud of what has been achieved. This<br />
is an <strong>in</strong>credibly solid and yet decorative<br />
piece of oak sculpture which has been<br />
created by work<strong>in</strong>g to the very limits of<br />
structural and decorative jo<strong>in</strong>ery.” (mb)<br />
Prelim<strong>in</strong>ary construction of the fanvaulted<br />
ceil<strong>in</strong>g at TMJ's workshop<br />
Us<strong>in</strong>g a w<strong>in</strong>ch, the first of eight<br />
structural sections is hoisted <strong>in</strong>to<br />
position <strong>in</strong> the tower.<br />
7<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION
RESEARCH<br />
SIMENT <strong>GmbH</strong> – simulation<br />
Numerical simulation optimizes functionality and co<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />
8<br />
Multibody simulation<br />
Temperature fields<br />
P<br />
rogress based on tradition – This<br />
is not only the ma<strong>in</strong> guid<strong>in</strong>g pr<strong>in</strong>ciple<br />
of the corporate philosophy of the<br />
SCHERDELGroup but it also describes<br />
day-to-day reality <strong>in</strong> the research and<br />
development activities, to which the<br />
Company attaches great importance.<br />
Here numerical simulation plays a major<br />
role as a tool used <strong>in</strong> <strong>process</strong> optimization<br />
and <strong>in</strong> product development.<br />
The ma<strong>in</strong> aims beh<strong>in</strong>d the use of computer-simulated<br />
<strong>process</strong>es are: shorter<br />
development times; cost-sav<strong>in</strong>g <strong>in</strong> relation<br />
to tests and prototype manufacture;<br />
more expertise <strong>in</strong> the choice of materials;<br />
and decision-mak<strong>in</strong>g based on<br />
sound scientific knowledge.<br />
S<strong>in</strong>ce 1997 numerical simulation has<br />
become <strong>in</strong>creas<strong>in</strong>gly important <strong>in</strong> the<br />
SCHERDELGroup. This tool aimed at<br />
improv<strong>in</strong>g predictions relat<strong>in</strong>g to the<br />
technical characteristics of stamp<strong>in</strong>gs<br />
and shaped components was first used<br />
at the location <strong>in</strong> Marktredwitz. However,<br />
the Mechanical Eng<strong>in</strong>eer<strong>in</strong>g Division<br />
with its headquarters <strong>in</strong> Coburg very<br />
Modal analyses and frequency responses<br />
soon began to benefit too from the use<br />
of the F<strong>in</strong>ite Element Method <strong>in</strong> relation<br />
to product development. On account of<br />
this positive experience, the General<br />
Management of the SCHERDELGroup<br />
decided to concentrate the tasks relat<strong>in</strong>g<br />
to numerical simulation <strong>in</strong> a company<br />
created for this purpose – the beg<strong>in</strong>n<strong>in</strong>g<br />
of Siment <strong>GmbH</strong>. Today, this company<br />
is a firmly established member of<br />
the Group offer<strong>in</strong>g a wide range of services.<br />
Outside the SCHERDELGroup it<br />
also provides valuable support <strong>in</strong> relation<br />
to product development for wellknown<br />
companies from many fields of<br />
<strong>in</strong>dustry.<br />
In addition to design, test<strong>in</strong>g, prototype<br />
manufacture and decades of experience,<br />
simulation is one of the ma<strong>in</strong> elements<br />
of all development <strong>process</strong>es <strong>in</strong><br />
Dynamic characteristics of a spr<strong>in</strong>g<br />
the SCHERDELGroup. The fact that the<br />
expertise available <strong>in</strong> all these fields<br />
can be called upon immediately results<br />
<strong>in</strong> an extremely dynamic development<br />
<strong>process</strong>. Problems are detected at an<br />
early stage and, on the basis of the virtual<br />
model, alternatives can be efficiently<br />
assessed and redesigned at a reasonable<br />
cost, or new, <strong>in</strong>novative solutions<br />
can be designed. Without the use<br />
of numerical tools, <strong>in</strong>novations such as<br />
sleeve spr<strong>in</strong>gs for piezo-<strong>in</strong>jection systems,<br />
dynamically stable spiral spr<strong>in</strong>gs<br />
for camshaft adjusters, or complex<br />
stamp<strong>in</strong>gs and shaped components for<br />
brakes would require an immense<br />
amount of prototyp<strong>in</strong>g and test<strong>in</strong>g.<br />
Siment is the world leader with regard<br />
to the dynamic calculation of valve<br />
spr<strong>in</strong>gs and the simulation of spr<strong>in</strong>g<br />
manufactur<strong>in</strong>g <strong>process</strong>es for the measurement<br />
of residual stress.<br />
Stability calculations
<strong>in</strong> the SCHERDELGroup<br />
sts <strong>in</strong> the development <strong>process</strong><br />
In mechanical eng<strong>in</strong>eer<strong>in</strong>g the range<br />
of activities <strong>in</strong>cludes simple strength<br />
tests and rigidity analyses, transient<br />
calculations of dynamic <strong>process</strong>es and<br />
the calculation of highly complicated,<br />
physically coupled connections <strong>in</strong> mechanical,<br />
electromagnetic or thermal<br />
systems.<br />
It makes no difference whether it's a<br />
question of vibrations <strong>in</strong> a mach<strong>in</strong>e or<br />
the simulation of flow configurations <strong>in</strong><br />
Flow simulation<br />
furnace <strong>in</strong>stallations – thanks to the use<br />
of numerical simulation dur<strong>in</strong>g the manufactur<strong>in</strong>g<br />
<strong>process</strong> the benefit for the<br />
customer is always the same: weak<br />
po<strong>in</strong>ts are elim<strong>in</strong>ated, efficiency is enhanced<br />
and functions are optimized.<br />
A team of expert eng<strong>in</strong>eers experienced<br />
<strong>in</strong> calculation work <strong>in</strong> various<br />
specialized fields (mechanical eng<strong>in</strong>eer<strong>in</strong>g,<br />
materials research, physics and<br />
mathematics) forms the core of Siment<br />
<strong>GmbH</strong>. These specialists devote all<br />
their energy to the tasks described<br />
above and are not satisfied until the<br />
problem has been solved.<br />
The calculation methods are cont<strong>in</strong>ually<br />
be<strong>in</strong>g adapted to suit customer requirements.<br />
By means of the crash<br />
software known as "PamCrash", for example,<br />
SCHERDEL was able to offer its<br />
customers the complete development<br />
<strong>process</strong> relat<strong>in</strong>g to metal structures for<br />
vehicle seat<strong>in</strong>g.<br />
Optimization<br />
Whether design, calculation of the<br />
standard types of load (protection<br />
aga<strong>in</strong>st load, headrest test etc.), prototyp<strong>in</strong>g<br />
or series production, all the measures<br />
are available from a s<strong>in</strong>gle<br />
source. For the end-customers this represents<br />
a fully cost-optimized procedure<br />
which, <strong>in</strong> the last analysis, has def<strong>in</strong>itely<br />
strengthened SCHERDEL's position<br />
as a developer of metal structures for<br />
vehicle seat<strong>in</strong>g.<br />
At the end of 2008 Siment <strong>GmbH</strong><br />
moved <strong>in</strong>to new premises <strong>in</strong> the Walter<br />
Bach Development Centre <strong>in</strong> Poppenreuth<br />
near Marktredwitz. This has also<br />
paved the way for a possible <strong>in</strong>crease<br />
<strong>in</strong> the number of staff employed. (dk)<br />
Contact data<br />
SCHERDELGroup<br />
SIMENT <strong>GmbH</strong><br />
<strong>Scherdel</strong>straße 2<br />
D-95615 Marktredwitz<br />
Germany<br />
Georg Hannig,<br />
graduate <strong>in</strong> physics<br />
Tel. +49 9231 603-610<br />
e-mail: <strong>in</strong>fo@siment.de<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />
Process simulation<br />
Program development<br />
9
RESEARCH<br />
Staff profile<br />
We'd like to <strong>in</strong>troduce staff members<br />
to you who will act as your<br />
contact if required.<br />
Research creates a good k<br />
SCHERDEL develops standards and specifications<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />
10<br />
Werner Schelter, Master of<br />
Bus<strong>in</strong>ess Adm<strong>in</strong>istration and<br />
Head of the F<strong>in</strong>ance Department<br />
Mr Werner Schelter was born <strong>in</strong><br />
Wunsiedel <strong>in</strong> 1956. After obta<strong>in</strong><strong>in</strong>g<br />
his A levels he studied bus<strong>in</strong>ess<br />
economics at Bayreuth, his special<br />
subjects be<strong>in</strong>g f<strong>in</strong>ancial management<br />
and bank<strong>in</strong>g, as well as taxation<br />
and audit<strong>in</strong>g. As a Master of<br />
Bus<strong>in</strong>ess Adm<strong>in</strong>istration he began<br />
work<strong>in</strong>g as an assistant auditor for<br />
a medium-sized firm of chartered<br />
accountants and tax consultants.<br />
In connection with this activity,<br />
Mr Schelter already undertook the<br />
task of draw<strong>in</strong>g up and audit<strong>in</strong>g<br />
the annual f<strong>in</strong>ancial statements<br />
and tax returns of the<br />
SCHERDELGroup.<br />
After a few years he moved to<br />
another job, this time to “Stahl-und<br />
Drahtwerk Röslau” where he was<br />
employed for some time as Head<br />
of the Account<strong>in</strong>g Department. On<br />
the first of July, 1996, Mr Schelter<br />
then moved to the SCHERDEL-<br />
Group where he took on the<br />
post of Head of the Department<br />
responsible for Bookkeep<strong>in</strong>g,<br />
F<strong>in</strong>ance and Annual Statements.<br />
His work is ma<strong>in</strong>ly concerned with<br />
draw<strong>in</strong>g up the annual f<strong>in</strong>ancial<br />
statements and tax returns, and<br />
deal<strong>in</strong>g with external audits. In addition,<br />
he is also responsible for<br />
the f<strong>in</strong>ancial management of the<br />
whole Group, the <strong>in</strong>surance<br />
arrangements, the company<br />
pension scheme and the employee<br />
share scheme.<br />
Mr Schelter is married and has<br />
three grown-up children. He devotes<br />
his leisure time to his family<br />
and his hobbies: literature and<br />
cook<strong>in</strong>g.<br />
R<br />
esearch and development work<br />
plays a very important part <strong>in</strong> the<br />
SCHERDELGroup, which has a department<br />
specially devoted to all the activities<br />
connected with this field. Here it is<br />
noticeable that <strong>in</strong> recent years the number<br />
of projects and <strong>in</strong>vestigations has<br />
risen steadily. The follow<strong>in</strong>g describes<br />
the ma<strong>in</strong> tasks <strong>in</strong>volved <strong>in</strong> research and<br />
development work. In the next edition<br />
of SCHERDELnews the second part of<br />
this article will tell you about the most<br />
<strong>in</strong>terest<strong>in</strong>g technical facilities <strong>in</strong> this Department.<br />
Tensile tests carried out on receipt of new materials<br />
One of the most important tasks <strong>in</strong> relation<br />
to R & D work is the development<br />
of materials, <strong>process</strong>es and measur<strong>in</strong>g<br />
techniques, as well as the provision of<br />
the technical know-how for the whole<br />
SCHERDELGroup. The central laboratory<br />
is responsible for the exam<strong>in</strong>ation<br />
of materials and components. In the<br />
measur<strong>in</strong>g and test<strong>in</strong>g shop, fatigue<br />
tests and measurements relat<strong>in</strong>g to the<br />
dynamic behaviour of spr<strong>in</strong>gs are carried<br />
out. The staff of the R & D Department<br />
are also <strong>in</strong> charge of the organization<br />
of both <strong>in</strong>ternal and external<br />
tra<strong>in</strong><strong>in</strong>g courses. They are also <strong>in</strong>volved<br />
to a great extent <strong>in</strong> assist<strong>in</strong>g students<br />
with projects relat<strong>in</strong>g to their studies, or<br />
with their dissertation, Bachelor's or<br />
Master's thesis. They also help pupils<br />
with work concern<strong>in</strong>g technical projects<br />
and a wide range of technical services<br />
is available for external customers. A<br />
great deal of time is also devoted to<br />
participation <strong>in</strong> external research projects.<br />
Here, SCHERDEL is also active<br />
as a research partner and as a member<br />
of committees accompany<strong>in</strong>g projects.<br />
In addition to support<strong>in</strong>g the whole<br />
Group with regard to applications for<br />
subsidies, the R & D Department is also<br />
<strong>in</strong>volved <strong>in</strong> work relat<strong>in</strong>g to standardization.<br />
It produces its own technical<br />
publications as well as collect<strong>in</strong>g technical<br />
<strong>in</strong>formation to extend its store of<br />
knowledge.<br />
The development of materials also <strong>in</strong>cludes<br />
the sett<strong>in</strong>g up of new supply<br />
cha<strong>in</strong>s <strong>in</strong> order to be able to offer extremely<br />
strong valve-spr<strong>in</strong>g wires, for<br />
example, or by alter<strong>in</strong>g the materials to<br />
provide more efficient components with<br />
an improved design for new types of<br />
applications. One technical <strong>process</strong><br />
used here, for example, is the thermal<br />
treatment of valve spr<strong>in</strong>gs to improve<br />
a component's characteristics.<br />
SCHERDEL is constantly on the lookout<br />
for wires and metal strips which offer<br />
an improved resistance to extreme<br />
stress such as high temperatures or<br />
corrosive environments. With this <strong>in</strong><br />
view, the Group develops its own standards<br />
and delivery requirements.<br />
Process development is concerned with<br />
the fields of metal work<strong>in</strong>g, jo<strong>in</strong><strong>in</strong>g techniques,<br />
metal cutt<strong>in</strong>g, thermal treatment<br />
us<strong>in</strong>g lasers for example, shot peen<strong>in</strong>g<br />
and the protection of spr<strong>in</strong>gs aga<strong>in</strong>st<br />
corrosion us<strong>in</strong>g various surface treatments<br />
or coat<strong>in</strong>gs. Development work<br />
relat<strong>in</strong>g to measur<strong>in</strong>g techniques focuses<br />
on measurements of stress, force<br />
and valve tra<strong>in</strong> carried out on a test<strong>in</strong>g<br />
stand driven by an electromotor; on<br />
carry<strong>in</strong>g out fatigue tests and produc<strong>in</strong>g<br />
fatigue-strength diagrams; on further<br />
develop<strong>in</strong>g spr<strong>in</strong>g scales; and on deal<strong>in</strong>g<br />
with various metrological problems.<br />
Failure analysis us<strong>in</strong>g the scann<strong>in</strong>g electron<br />
microscope
nowledge base<br />
for new types of material and suppliers<br />
Test<strong>in</strong>g the technical cleanl<strong>in</strong>ess<br />
The laboratory activities concentrate<br />
on carry<strong>in</strong>g out quality-assurance tests,<br />
failure analyses and special exam<strong>in</strong>ations.<br />
For this work an extensive range<br />
of appliances is available. This <strong>in</strong>cludes<br />
equipment for chemical analyses, tension-test<strong>in</strong>g<br />
and torsion-test<strong>in</strong>g mach<strong>in</strong>es,<br />
a metallographic facility with<br />
preparation of microsections, durometers<br />
and light-optical microscopy, a<br />
scann<strong>in</strong>g electron microscope with EDX<br />
analysis system, an X-ray diffractometer,<br />
as well as appliances for determ<strong>in</strong><strong>in</strong>g<br />
the thickness of a coat<strong>in</strong>g and surface<br />
roughness, and for test<strong>in</strong>g the<br />
technical cleanl<strong>in</strong>ess. In the corrosion<br />
laboratory SCHERDEL has all the<br />
equipment required for carry<strong>in</strong>g out<br />
salt-spray, Kesternich or condensationwater<br />
test<strong>in</strong>g procedures.<br />
In the test<strong>in</strong>g shop the activities <strong>in</strong>clude<br />
the measurement of stress by<br />
means of stra<strong>in</strong> gauges or determ<strong>in</strong><strong>in</strong>g<br />
dynamic parameters on cyl<strong>in</strong>der heads.<br />
The cyl<strong>in</strong>der-head test<strong>in</strong>g stand driven<br />
by an electromotor is fitted with a laser<br />
measur<strong>in</strong>g system. The test<strong>in</strong>g shop is<br />
also well-equipped for carry<strong>in</strong>g out the<br />
fatigue tests and the vibration tests required<br />
for quality assurance: the spr<strong>in</strong>g<br />
fatigue-test<strong>in</strong>g mach<strong>in</strong>es are made by<br />
well-known manufacturers such as<br />
Bosch, Reicherter and Schenck or, to<br />
meet special requirements, they were<br />
developed and constructed by<br />
SCHERDEL <strong>in</strong>-house. To complete its<br />
equipment, the test<strong>in</strong>g shop has stateof-the-art,<br />
rotat<strong>in</strong>g-bend<strong>in</strong>g test mach<strong>in</strong>es<br />
for wires.<br />
SCHERDEL employs a large number<br />
of staff and <strong>in</strong>vests a lot of money <strong>in</strong> relation<br />
to research and development<br />
work, the aim be<strong>in</strong>g to offer all its customers<br />
top quality and highly efficient<br />
products comb<strong>in</strong>ed with cost-optimization.<br />
In the future too, the day-to-day<br />
activities of the SCHERDELGroup will<br />
show that the guid<strong>in</strong>g pr<strong>in</strong>ciple of the<br />
corporate philosophy "Progress based<br />
on tradition – Growth thanks to <strong>in</strong>novation"<br />
is both our claim and our duty. In<br />
the next edition we will provide you with<br />
a detailed description of some of the<br />
appliances mentioned and expla<strong>in</strong> how<br />
they work.<br />
(dk)<br />
New Service Centre <strong>in</strong><br />
Turkey<br />
In the course of the cont<strong>in</strong>ued<br />
<strong>in</strong>ternationalization of the Group,<br />
SCHERDEL has set up a new<br />
Service Centre (SSC) <strong>in</strong> the town<br />
of Osmangazi <strong>in</strong> Turkey. In recent<br />
years Turkey has developed<br />
<strong>in</strong>to an important sales market<br />
and, particularly with regard to<br />
the future, it is considered to be<br />
one of the ma<strong>in</strong> growth countries<br />
<strong>in</strong> Europe. Major <strong>in</strong>ternational automobile<br />
manufacturers and parts<br />
suppliers have already set up<br />
branches <strong>in</strong> the country on the<br />
Bosphorus and they rank among<br />
SCHERDEL's established bus<strong>in</strong>ess<br />
partners. Turkey plays an<br />
important part <strong>in</strong> the Group's<br />
strategic plann<strong>in</strong>g as well, s<strong>in</strong>ce it<br />
acts as a bridgehead to the<br />
neighbour<strong>in</strong>g Asiatic countries<br />
which, <strong>in</strong> their turn, also have a<br />
great potential for growth. On account<br />
of its relatively large population<br />
Turkey itself also presents<br />
a market with good prospects.<br />
The new SSC provides "locally<br />
based" expert advice and detailed<br />
customer service <strong>in</strong> relation<br />
to current series products as well<br />
as for new developments. By develop<strong>in</strong>g<br />
the partnership-based<br />
co-operation between customers<br />
and suppliers, the jo<strong>in</strong>t aim is to<br />
open up additional market potential.<br />
(dk)<br />
Service Centre Turkey<br />
Uluyol Cd. Gönül Sk.<br />
Tezeller Ishani Kat 3/19<br />
16220 Osmangazi / Bursa<br />
Mehmet Eng<strong>in</strong> Bilgen<br />
Tel.: +90 224 272 7393<br />
Fax: +90 224 272 7393<br />
Mobile: +90 507 958 8889<br />
e-mail: mebilgen@modusteam.com<br />
Olgun Ek<strong>in</strong><br />
Tel.: +90 224 272 7393<br />
Fax: +90 224 272 7393<br />
Mobile: +90 533 337 7955<br />
e-mail: oek<strong>in</strong>@modusteam.com<br />
11<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION
SCHERDEL-SPONSORING<br />
MECHANICAL ENGINEERING - TECHNOLOGY & PRODUCT DEVELOPMENT - NEWS AND INFORMATION<br />
The new RS10-LC4 of the Amberg/Weiden<br />
Technical College.<br />
Tak<strong>in</strong>g this car as a basis, the plan<br />
is to construct an electrically driven<br />
rac<strong>in</strong>g car which will be ready for<br />
action this year. The electromotor<br />
will have a capacity of around 48<br />
kW. The torque of 60 Nm will be<br />
fully available throughout a speed<br />
range of 0 to 7700 r.p.m. We can<br />
therefore expect an impressive<br />
performance from this car.<br />
In the runn<strong>in</strong>g with<br />
E-motion<br />
SCHERDEL supports the Amberg/Weiden<br />
Technical College <strong>in</strong> build<strong>in</strong>g a rac<strong>in</strong>g car<br />
S<br />
CHERDEL's efforts to support the<br />
"Runn<strong>in</strong>g-Snail-Rac<strong>in</strong>g-Team" of<br />
the Amberg-Weiden Technical College<br />
provide just one example among many<br />
of the Group's co-operation with technical<br />
colleges, universities and educational<br />
establishments. Under the guidance<br />
of their professor, Dr. Horst Rönnebeck,<br />
the students have been engaged<br />
for some time <strong>in</strong> the construction<br />
of a rac<strong>in</strong>g car, which has been completely<br />
developed <strong>in</strong>-house. Bear<strong>in</strong>g the<br />
name "Runn<strong>in</strong>g-Snail" it takes part<br />
every year <strong>in</strong> the "Formula Student"<br />
races. By provid<strong>in</strong>g them with the<br />
appropriate services, SCHERDEL<br />
supports these young people <strong>in</strong> the<br />
development of their rac<strong>in</strong>g car. In<br />
the presence of Johann Schörner, a<br />
SCHERDEL employee, what is now the<br />
sixth version of the car was presented<br />
to the public recently <strong>in</strong> Amberg.<br />
Thanks to its body shell made of carbon,<br />
the new RS10-LC4 weighs only<br />
163 kilograms – a real light-weight. In<br />
addition, a traction-control facility helps<br />
The value cha<strong>in</strong> at SCHERDEL<br />
SCHERDEL<br />
Materials/Supplier<br />
management<br />
• Supplier development<br />
SCHERDEL<br />
Research &<br />
Development<br />
• Materials development<br />
• Laboratory<br />
• Product development<br />
• Numerical simulation<br />
• Process development<br />
• Prototype manufacture<br />
SCHERDEL<br />
Production<br />
• Form<strong>in</strong>g technology<br />
• Manufactur<strong>in</strong>g technology<br />
• Assembly technology<br />
• Surface f<strong>in</strong>ish<strong>in</strong>g<br />
• Automation<br />
to prevent wheelsp<strong>in</strong> or excessive rotation<br />
of the wheels. In the past, the students<br />
took part <strong>in</strong> races <strong>in</strong> Germany,<br />
Italy and England. Admittedly, they<br />
haven't yet won any of the coveted trophies<br />
but usually they were among the<br />
top ten. Equipped with a KTM combustion<br />
eng<strong>in</strong>e, the car atta<strong>in</strong>s a speed of<br />
180 km/h on the track. It accelerates<br />
from 0 to 100 km/h <strong>in</strong> just four seconds.<br />
The new RS10-LC4 will make its<br />
first appearance on the race-track <strong>in</strong><br />
July at Silverstone, one of the really<br />
traditional venues for motor-rac<strong>in</strong>g<br />
fans. However, at the Amberg Technical<br />
College they're already th<strong>in</strong>k<strong>in</strong>g<br />
about the future: next year the students<br />
want to be "<strong>in</strong> the runn<strong>in</strong>g" with an<br />
electrically driven vehicle. Once aga<strong>in</strong><br />
SCHERDEL will provide support for the<br />
build<strong>in</strong>g of this electric rac<strong>in</strong>g car. The<br />
aim is that this car will put on a good<br />
show when it takes part <strong>in</strong> the "Formula<br />
Electric Germany" races, thus demonstrat<strong>in</strong>g<br />
the talent of the team of young<br />
developers from Bavaria.<br />
(dk)<br />
SCHERDEL<br />
Logistics<br />
• Packag<strong>in</strong>g<br />
• Logistics centre<br />
• Warehous<strong>in</strong>g<br />
• Just-<strong>in</strong>-time system<br />
12<br />
Responsible <strong>in</strong> terms of the Press Law: SCHERDEL <strong>GmbH</strong>, PO Box 440, 95604 Marktredwitz, Germany, Phone: +49 9231603-0, Fax: +49 9231603-462