29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Version 6/19/12<br />

B. Refer to Public Works Construction <strong>Standards</strong>, NCTCOG, 4 th Edition, Item 107.19.3.6 for<br />

measurement <strong>of</strong> trench safety.<br />

4.02 PAYMENT<br />

A. Refer to Public Works Construction <strong>Standards</strong>, NCTCOG, 4 th Edition, Item 504.7 for<br />

payment <strong>of</strong> backfill.<br />

B. Refer to Public Works Construction <strong>Standards</strong>, NCTCOG, 4 th Edition, Item 107.19.3.6 for<br />

payment <strong>of</strong> trench safety.<br />

C. All excavation for utility installation shall be considered subsidiary to the utility bid item.<br />

No separate pay item for excavation, backfill and/or trenching, unless otherwise noted.<br />

END OF SECTION<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Trenching, Backfilling and Compaction 330510-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!