29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Version 6/19/12<br />

PART 4 - MEASUREMENT AND PAYMENT<br />

4.01 MEASUREMENT<br />

A. This Item will be measured on a Lump Sum (LS) basis.<br />

B. Contractor shall submit a Schedule <strong>of</strong> Values prior to beginning any work on this project.<br />

4.02 PAYMENT<br />

A. All work performed and materials furnished in accordance with this Item will be paid for at<br />

the unit price for “Installation <strong>of</strong> Highway Traffic Signal.” This price is full compensation<br />

for all material, labor, equipment, tools and superintendence necessary to complete this work.<br />

END OF SECTION<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Installation <strong>of</strong> Highway Traffic Signal 344113-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!