FIELD TESTING AND EVALUATION OF DUST DEPOSITION AND ...
FIELD TESTING AND EVALUATION OF DUST DEPOSITION AND ...
FIELD TESTING AND EVALUATION OF DUST DEPOSITION AND ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
100%<br />
90%<br />
80%<br />
Relative Frequency (probability)<br />
Cumulative %<br />
Relative Frequency<br />
70%<br />
60%<br />
50%<br />
40%<br />
30%<br />
20%<br />
10%<br />
0%<br />
0 -10 10 - 20 20 - 30 30 - 40 40 - 50 50 - 60 > 60<br />
u* (cm/s)<br />
Figure 5-3. Frequency distribution and cumulative distribution of u * for the 110 15-minute intervals<br />
corresponding to periods when testing was ongoing at Ft. Bliss. The u * values are based on a<br />
roughness height, z 0 equal to 0.005 m.<br />
u*= 10 cm/s<br />
u*= 32 cm/s<br />
u*= 54 cm/s<br />
14<br />
u(z) measured<br />
u(z) fitted<br />
14<br />
u(z) measured<br />
u(z) fitted<br />
14<br />
u(z) measured<br />
u(z) fitted<br />
12<br />
12<br />
12<br />
Height (z) in meters<br />
10<br />
8<br />
6<br />
4<br />
Height (z) in meters<br />
10<br />
8<br />
6<br />
4<br />
Height (z) in meters<br />
10<br />
8<br />
6<br />
4<br />
2<br />
2<br />
2<br />
0<br />
12 16 20 24<br />
u(z)/u *<br />
0<br />
12 16 20 24<br />
u(z)/u*<br />
a. b. c.<br />
0<br />
12 16 20 24<br />
u(z)/u*<br />
Figure 5-4. Examples of comparison between measured wind speed and wind speed calculated from<br />
curve fitting of Equation 2-9. a. light winds (u * =10 cm/s), b. medium winds (u * = 32 cm/s), c. high<br />
winds (u * = 54 cm/s). The roughness height, z 0 is equal to 0.005 m in all cases.<br />
5-5