29.07.2014 Views

Royal Rouge Trail Erosion Control Project - Toronto and Region ...

Royal Rouge Trail Erosion Control Project - Toronto and Region ...

Royal Rouge Trail Erosion Control Project - Toronto and Region ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The following is an outline of the tentative project schedule:<br />

5.0 SUMMARY<br />

The <strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong> <strong>Erosion</strong> <strong>Control</strong> <strong>Project</strong> will examine <strong>and</strong> address the on-going slope<br />

instability <strong>and</strong> long-term risk to property through the Class EA process.<br />

The Class EA process is a self-assessment process m<strong>and</strong>ated by Conservation Ontario for use<br />

by all CA’s for the purpose of addressing Remedial Flood <strong>and</strong> <strong>Erosion</strong> <strong>Control</strong> <strong>Project</strong>s. The<br />

Class EA includes a strong public input component through the planning <strong>and</strong> design phases of<br />

the project.<br />

8<br />

CLC Information Package<br />

<strong>Toronto</strong> <strong>and</strong> <strong>Region</strong> Conservation Authority<br />

<strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong> <strong>Erosion</strong> <strong>Control</strong> <strong>Project</strong> April 29, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!