- Page 1 and 2:
Royal Rouge Trail Erosion Control P
- Page 3 and 4:
Executive Summary Toronto and Regio
- Page 5 and 6:
5.1.2 Biological Environment.......
- Page 7 and 8:
1.0 INTRODUCTION Toronto and Region
- Page 9 and 10:
Almost twenty years of experience h
- Page 11 and 12:
Canadensis), Eastern white pine (Pi
- Page 13 and 14:
Figure 7. Active erosion behind Nos
- Page 15 and 16:
1.5 Rationale for Undertaking In 20
- Page 17 and 18:
The results of the adoption of the
- Page 19 and 20:
danger to the existing dwelling, so
- Page 21 and 22:
A Rouge Watershed Task Force was fo
- Page 23 and 24:
Toronto Transit Commission (TTC) we
- Page 25 and 26:
were involved in long range exchang
- Page 27 and 28:
four of which are interrupted by th
- Page 29 and 30:
Three sites of potential importance
- Page 31 and 32:
Conduct Archaeological Exploration
- Page 33 and 34: The primary purpose of the Stage 3
- Page 35 and 36: 2.4.3 Corvese Site (AKGs-046) The C
- Page 37 and 38: during the Stage 4 excavation, whic
- Page 39 and 40: Toronto Field Naturalists Toronto O
- Page 41 and 42: 20-Oct-09 6:00 AM 10 Ozone (O3) 20-
- Page 43 and 44: L4 Generally secure; may be a conse
- Page 45 and 46: Flora Species of Concern Rouge Vall
- Page 47 and 48: Fauna Species of Concern Rouge Rive
- Page 49 and 50: Table 8. Bird Species observed with
- Page 51 and 52: Figure 17. General area of Rouge Ri
- Page 53 and 54: 5) Six Nations of the Grand River T
- Page 55 and 56: 42 14 3 5 44 14 6 9 46 14 9 11 48 1
- Page 57 and 58: 2. Concept 2 - Extended Retaining W
- Page 59 and 60: As this option does not address, re
- Page 61 and 62: Figure 21. Proposed Preliminary Con
- Page 63 and 64: Table 13 provides a comparison of t
- Page 65 and 66: 5.0 ENVIRONMENTAL SCREENING 5.1 Det
- Page 67 and 68: Rating of Potential Effects Screeni
- Page 69 and 70: Habitat Linkages or Corridors The p
- Page 71 and 72: Existing Infrastructure, Support Se
- Page 73 and 74: Comment forms were distributed by T
- Page 75 and 76: the options presented, to select th
- Page 77 and 78: Government of Canada. Committee on
- Page 79: APPENDIX A Criteria & Implementatio
- Page 98 and 99: APPENDIX D Public, Agency and Abori
- Page 100 and 101: onserRvaNuon for The Living City 1
- Page 102 and 103: onserRvaNuon for The Living City 1
- Page 104: onserRvaNfiOn for The Living City 1
- Page 107 and 108: onserRvaNuon for The Living City 1
- Page 109 and 110: onserRvaNiiOn for The Living City 1
- Page 111 and 112: Patricia Newland/MTRCA 05/12/2009 0
- Page 113 and 114: History: STEVE FOSTER 05/19/2009 0
- Page 115 and 116: onserRvaNuon for The Living City 1
- Page 117 and 118: onserRvaoon for The Living City 1 E
- Page 119 and 120: onservaoon for The Living City 1 Ea
- Page 121 and 122: onserRvaNuon for The Living City 1
- Page 123 and 124: onserRvifNoon for The Living City 1
- Page 125 and 126: onserRvaNoon for The Living City 1
- Page 127 and 128: COMMUNITY LIAISON COMMITTEE INFORMA
- Page 129 and 130: 1.0 PROJECT DESCRIPTION The Toronto
- Page 131 and 132: 2.2 Definitions of Undertakings Wit
- Page 133 and 134: 2.4.1 The Baseline Inventory The ba
- Page 135 and 136:
of interest from the local landowne
- Page 137 and 138:
6.0 GLOSSARY OF TERMS (Excerpt from
- Page 139 and 140:
11 CLC Information Package Toronto
- Page 141 and 142:
13 CLC Information Package Toronto
- Page 143 and 144:
15 CLC Information Package Toronto
- Page 145 and 146:
Monday, April 06, 2009 Aaniin, In a
- Page 147 and 148:
2 The efTect of the Williams Treati
- Page 149 and 150:
4 The Treat.v- of 1818 'freaty No.2
- Page 151 and 152:
The burden of proving that a Treaty
- Page 153 and 154:
8 Burleigh Falls community. no memb
- Page 155 and 156:
10 clearlv' whenever any branch or
- Page 158 and 159:
TORONTO AND REGION CONSERVATION AUT
- Page 160 and 161:
TORONTO AND REGION CONSER ROYAL ROU
- Page 162 and 163:
Project Location 30 - 48 Royal Roug
- Page 164 and 165:
Step 3: The Baseline Inventory Clas
- Page 166 and 167:
Existing Conditions ● Slope re-in
- Page 168 and 169:
30 to 32 Royal Rouge Trail Evaluati
- Page 170 and 171:
Site A - Preliminary Concept 2 Typi
- Page 172 and 173:
Construction of Siena Stone Walls E
- Page 174 and 175:
Thank you for your time ☺ 13
- Page 176 and 177:
CFN 39382.1 B3-33-2 • Jason Crowd
- Page 178 and 179:
determined, but that there may be s
- Page 180:
species present. ‣ MM adds that a
- Page 189 and 190:
3. Please rank your responses to th
- Page 191:
3. Please rank your responses to th
- Page 195 and 196:
Sparks 06/30/2009 03:12 PM To cc b
- Page 199 and 200:
"Maria Papoulias" 07/02/2009 04:49
- Page 201 and 202:
e~ .J'd (; #~~?~d ~ ~ ~ ~ AILe>
- Page 203 and 204:
NOTICE OF PUBLIC MEETING ROYAL ROUG
- Page 205:
"*PLEASE CONSIDER THE ENVIRONMENT W
- Page 208 and 209:
30 - 48 Royal Rouge Trail Erosion C
- Page 210 and 211:
• “Do Nothing” Do Nothing Sce
- Page 212 and 213:
Site B - Preliminary Concept 2 •
- Page 214 and 215:
Wall Design • Assessed for Global
- Page 216 and 217:
TORONTO AND REGION CONSERVATION AUT
- Page 218 and 219:
CFN 38392 B3-33-2 5. Site B: Concep
- Page 220 and 221:
CFN 38392 B3-33-2 along the tablela
- Page 222 and 223:
CFN 38392 B3-33-2 In the event that
- Page 224:
CFN 38392 B3-33-2 ‣ JC adds the r
- Page 229 and 230:
"trevor d'souza" 01/04/2010 01:15
- Page 231:
I have a few comments on the Royal
- Page 235 and 236:
1. Please define "trimming" in lay
- Page 237:
Royal Trust Tower, TD Centre, Suite
- Page 240 and 241:
30 - 48 Royal Rouge Trail Erosion C
- Page 242 and 243:
Proposed Stage 3 Investigation Next
- Page 244 and 245:
CFN 38392 B3-33-2 3. Determine limi
- Page 246 and 247:
CFN 38392 B3-33-2 • Attendee inqu
- Page 248 and 249:
CFN 38392 B3-33-2 be able to procee
- Page 250 and 251:
CFN 38392 B3-33-2 • PN thanks the
- Page 254 and 255:
Patricia Newland/MTRCA 08/24/2010 1
- Page 256 and 257:
Moranne McDonnell/MTRCA 05/27/2011
- Page 258 and 259:
Greetings everyone, Patricia Newlan
- Page 260 and 261:
Patricia Newland/TRCA 07/19/2011 03
- Page 262:
Toronto and Region Conservation Aut
- Page 266 and 267:
30 - 48 Royal Rouge Trail Erosion C
- Page 268 and 269:
Key Upcoming Project Milestones Pro
- Page 270 and 271:
CFN 38392 B3-33-2 MINUTES CLC Meeti
- Page 272 and 273:
CFN 38392 B3-33-2 backfill material
- Page 274 and 275:
CFN 38392 B3-33-2 • Q12 - An atte
- Page 276 and 277:
APPENDIX E Archaeological Site Clea
- Page 278 and 279:
Given the above, this Ministry is s
- Page 280 and 281:
2. In the event that human remains
- Page 282 and 283:
email: shughes@toronto.ca Website:
- Page 284:
"*PLEASE CONSIDER THE ENVIRONMENT W