- Page 1 and 2:
Royal Rouge Trail Erosion Control P
- Page 3 and 4:
Executive Summary Toronto and Regio
- Page 5 and 6:
5.1.2 Biological Environment.......
- Page 7 and 8:
1.0 INTRODUCTION Toronto and Region
- Page 9 and 10:
Almost twenty years of experience h
- Page 11 and 12:
Canadensis), Eastern white pine (Pi
- Page 13 and 14:
Figure 7. Active erosion behind Nos
- Page 15 and 16:
1.5 Rationale for Undertaking In 20
- Page 17 and 18:
The results of the adoption of the
- Page 19 and 20:
danger to the existing dwelling, so
- Page 21 and 22:
A Rouge Watershed Task Force was fo
- Page 23 and 24:
Toronto Transit Commission (TTC) we
- Page 25 and 26:
were involved in long range exchang
- Page 27 and 28:
four of which are interrupted by th
- Page 29 and 30:
Three sites of potential importance
- Page 31 and 32:
Conduct Archaeological Exploration
- Page 33 and 34:
The primary purpose of the Stage 3
- Page 35 and 36:
2.4.3 Corvese Site (AKGs-046) The C
- Page 37 and 38:
during the Stage 4 excavation, whic
- Page 39 and 40:
Toronto Field Naturalists Toronto O
- Page 41 and 42:
20-Oct-09 6:00 AM 10 Ozone (O3) 20-
- Page 43 and 44:
L4 Generally secure; may be a conse
- Page 45 and 46:
Flora Species of Concern Rouge Vall
- Page 47 and 48:
Fauna Species of Concern Rouge Rive
- Page 49 and 50:
Table 8. Bird Species observed with
- Page 51 and 52:
Figure 17. General area of Rouge Ri
- Page 53 and 54:
5) Six Nations of the Grand River T
- Page 55 and 56:
42 14 3 5 44 14 6 9 46 14 9 11 48 1
- Page 57 and 58:
2. Concept 2 - Extended Retaining W
- Page 59 and 60:
As this option does not address, re
- Page 61 and 62:
Figure 21. Proposed Preliminary Con
- Page 63 and 64:
Table 13 provides a comparison of t
- Page 65 and 66:
5.0 ENVIRONMENTAL SCREENING 5.1 Det
- Page 67 and 68:
Rating of Potential Effects Screeni
- Page 69 and 70:
Habitat Linkages or Corridors The p
- Page 71 and 72:
Existing Infrastructure, Support Se
- Page 73 and 74:
Comment forms were distributed by T
- Page 75 and 76:
the options presented, to select th
- Page 77 and 78:
Government of Canada. Committee on
- Page 79:
APPENDIX A Criteria & Implementatio
- Page 85:
APPENDIX C Design Drawings of the P
- Page 99 and 100:
28 SCARBOROUGH MIRROR | Friday, Mar
- Page 101 and 102:
onserRvaoon for The Living City 1 E
- Page 103 and 104:
onserRvaNiiOn for The Living City 1
- Page 106 and 107:
Patricia Newland/MTRCA 04/29/2009 0
- Page 108 and 109:
onserRvaoon for The Living City 1 E
- Page 110 and 111:
onserRvaNfiOn for The Living City 1
- Page 112 and 113:
[attachment "TALL PINES_CLC Map.pdf
- Page 114 and 115:
onservaNuon for The Living City 1 E
- Page 116 and 117:
If you have any questions or would
- Page 118 and 119:
If you have any questions or would
- Page 120 and 121:
onservaoon for The Living City 1 Ea
- Page 122 and 123:
If you have any questions or would
- Page 124 and 125:
If you have any questions or would
- Page 126 and 127:
If you have any questions or would
- Page 128 and 129:
This document has been prepared exc
- Page 130 and 131:
emedial works are required to provi
- Page 132 and 133:
• Remedial measures shall be desi
- Page 134 and 135:
TRCA remedial erosion control works
- Page 136 and 137:
The following is an outline of the
- Page 138 and 139:
10 CLC Information Package Toronto
- Page 140 and 141:
12 CLC Information Package Toronto
- Page 142 and 143:
14 CLC Information Package Toronto
- Page 144 and 145:
16 CLC Information Package Toronto
- Page 146 and 147: Christopher M. Reid Barrister & Sol
- Page 148 and 149: 3 factors. These divisions into new
- Page 150 and 151: communities to gather evidence of t
- Page 152 and 153: The Williams Treaties of 1923 Once
- Page 154 and 155: 9 The duty of the Crown to consult
- Page 156: n CON{CLTJSION fhe commlrnity.ol-Ka
- Page 159 and 160: 28 SCARBOROUGH MIRROR | Friday, Mar
- Page 161 and 162: TORONTO AND REGION CONSER' ROYAL RO
- Page 163 and 164: Step 1: Notify Public • “Notice
- Page 165 and 166: Geology of the Area BH1 BH2 BH3 Ter
- Page 167 and 168: 48 to 44 Royal Rouge Trail 42 Royal
- Page 169 and 170: Remediation Options • Site divide
- Page 171 and 172: Site B - Preliminary Concept 1 Typi
- Page 173 and 174: Site B - Preliminary Concept 2 Typi
- Page 175 and 176: CFN 39382.1 B3-33-2 MINUTES ROYAL R
- Page 177 and 178: CFN 39382.1 B3-33-2 ‣ Mike Tanos
- Page 179 and 180: ‣ JB & MM explain further about t
- Page 188 and 189: TORONTO AND REGION CONSERVATION AUT
- Page 190 and 191: TORONTO AND REGION CONSERVATION AUT
- Page 194 and 195: danielle giggie 06/30/2009 12:42 A
- Page 199 and 200: "Maria Papoulias" 07/02/2009 04:49
- Page 201 and 202: e~ .J'd (; #~~?~d ~ ~ ~ ~ AILe>
- Page 203 and 204: NOTICE OF PUBLIC MEETING ROYAL ROUG
- Page 205: "*PLEASE CONSIDER THE ENVIRONMENT W
- Page 208 and 209: 30 - 48 Royal Rouge Trail Erosion C
- Page 210 and 211: • “Do Nothing” Do Nothing Sce
- Page 212 and 213: Site B - Preliminary Concept 2 •
- Page 214 and 215: Wall Design • Assessed for Global
- Page 216 and 217: TORONTO AND REGION CONSERVATION AUT
- Page 218 and 219: CFN 38392 B3-33-2 5. Site B: Concep
- Page 220 and 221: CFN 38392 B3-33-2 along the tablela
- Page 222 and 223: CFN 38392 B3-33-2 In the event that
- Page 224: CFN 38392 B3-33-2 ‣ JC adds the r
- Page 229 and 230: "trevor d'souza" 01/04/2010 01:15
- Page 231: I have a few comments on the Royal
- Page 235 and 236: 1. Please define "trimming" in lay
- Page 237: Royal Trust Tower, TD Centre, Suite
- Page 240 and 241: 30 - 48 Royal Rouge Trail Erosion C
- Page 242 and 243: Proposed Stage 3 Investigation Next
- Page 244 and 245: CFN 38392 B3-33-2 3. Determine limi
- Page 246 and 247:
CFN 38392 B3-33-2 • Attendee inqu
- Page 248 and 249:
CFN 38392 B3-33-2 be able to procee
- Page 250 and 251:
CFN 38392 B3-33-2 • PN thanks the
- Page 254 and 255:
Patricia Newland/MTRCA 08/24/2010 1
- Page 256 and 257:
Moranne McDonnell/MTRCA 05/27/2011
- Page 258 and 259:
Greetings everyone, Patricia Newlan
- Page 260 and 261:
Patricia Newland/TRCA 07/19/2011 03
- Page 262:
Toronto and Region Conservation Aut
- Page 266 and 267:
30 - 48 Royal Rouge Trail Erosion C
- Page 268 and 269:
Key Upcoming Project Milestones Pro
- Page 270 and 271:
CFN 38392 B3-33-2 MINUTES CLC Meeti
- Page 272 and 273:
CFN 38392 B3-33-2 backfill material
- Page 274 and 275:
CFN 38392 B3-33-2 • Q12 - An atte
- Page 276 and 277:
APPENDIX E Archaeological Site Clea
- Page 278 and 279:
Given the above, this Ministry is s
- Page 280 and 281:
2. In the event that human remains
- Page 282 and 283:
email: shughes@toronto.ca Website:
- Page 284:
"*PLEASE CONSIDER THE ENVIRONMENT W