Royal Rouge Trail Erosion Control Project - Toronto and Region ...
Royal Rouge Trail Erosion Control Project - Toronto and Region ...
Royal Rouge Trail Erosion Control Project - Toronto and Region ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
the options presented, to select the preferred design concept, <strong>and</strong> to assess the importance<br />
of the evaluation criteria for each of the concepts presented.<br />
A draft version of the Environmental Study Report was also provided to the CLC Committee<br />
for preliminary review at the meeting.<br />
6.2.5 Meeting with Affected L<strong>and</strong>owners<br />
On June 22, 2010 a meeting with the affected l<strong>and</strong>owners was held at the West <strong>Rouge</strong><br />
Community Centre to discuss the preliminary findings of the Stage 1 & 2 Archaeological<br />
Assessment that was completed in the Spring of 2010.<br />
At the meeting, staff from TRCA Archaeology Resources Department discussed the initial<br />
findings of the Stage 1 <strong>and</strong> 2 archaeological assessment of the site, <strong>and</strong> outlined the<br />
importance of completing Stage 3 <strong>and</strong> 4 assessments on several of the properties in the<br />
study area.<br />
6.2.6 Community Liaison Committee Meeting #3<br />
A CLC Meeting was held on Wednesday August 17, 2011 at the Tall Pines Community Centre<br />
to present the refined, final designs to the CLC, <strong>and</strong> to discuss the next steps for the project.<br />
6.2.7 Notice of Filing<br />
The second public notification will occur when the <strong>Project</strong> Plan is filed on August 26 th , 2011.<br />
As per the requirements of Section 4.2 of the Class EA document, a Notice of Filing will be<br />
distributed to all of the parties contacted in the Notice of Intent that expressed interest in the<br />
project <strong>and</strong> to the Conservation Ontario <strong>and</strong> the Ministry of the Environment. Copies of this<br />
report will be provided at the local Councillor’s office, the Port Union Public Library, on the<br />
TRCA website http://www.trca.on.ca/protect/environmental-assessment-projects/royalrouge-trail-erosion-control-project.dot,<br />
<strong>and</strong> at the TRCA Eastville office for public review<br />
during the 30 day review period.<br />
6.2.8 Notice of <strong>Project</strong> Approval<br />
In the interest of good project management, a Notice of <strong>Project</strong> Approval <strong>and</strong> a Notice of<br />
<strong>Project</strong> Completion shall be sent to all parties who expressed an interest in the project <strong>and</strong> to<br />
Conservation Ontario.<br />
6.3 First Nation <strong>and</strong> Aboriginal Group Consultation<br />
As discussed in Section 3.1.3 TRCA contacted the Ontario Ministry of Aboriginal Affairs to<br />
inquire about the status of any l<strong>and</strong> claims within the study area. As confirmed by the<br />
Ministry, there are no active claims in the study area<br />
Further, the following Aboriginal Groups, as provided by TRCA Archaeological Resources<br />
Staff, were contacted regarding the proposed project, <strong>and</strong> provided with the opportunity to<br />
provide feedback on any concerns regarding the study area, <strong>and</strong> to participate in public<br />
consultation for this project.<br />
69<br />
<strong>Project</strong> Plan<br />
<strong>Toronto</strong> <strong>and</strong> <strong>Region</strong> Conservation Authority<br />
<strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong> <strong>Erosion</strong> <strong>Control</strong> <strong>Project</strong> August 17, 2011