Step 3: The Baseline Inventory<br />
Class EA Planning <strong>and</strong> Design Process<br />
A full description of the baseline will be documented in the final report for this<br />
project that will:<br />
• Ensure that both the directly <strong>and</strong> indirectly<br />
affected environments are taken into<br />
consideration during the development <strong>and</strong><br />
design of the preferred remedial measure<br />
• Serve as a baseline from which to<br />
monitor the effectiveness of the<br />
action taken<br />
Geotechnical Investigation <strong>and</strong><br />
Slope Stability Analysis<br />
Geotechnical Investigation <strong>and</strong><br />
Slope Stability Analysis<br />
#30 to #48 <strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong><br />
<strong>Toronto</strong>, Ontario<br />
Prepared by Terraprobe Ltd.<br />
Mike Tanos, P.Eng.<br />
Jason Crowder, P.Eng.<br />
June 18, 2009<br />
Terraprobe<br />
Ltd.<br />
Site Overview - Previous Investigations<br />
Outline of Work<br />
● Site Overview – Previous Investigations<br />
● Geology <strong>and</strong> Subsurface Conditions<br />
● Site Inspection 2007<br />
● Existing Conditions 2009<br />
● Development of Remedial Alternatives<br />
● 1984 - Geotechnical Investigation (Soil-Eng) for subdivision plan<br />
approval<br />
● 1985 - Stormwater Management Report (Fred Shaeffer & Assoc) as part<br />
of TRCA purchase of ravine l<strong>and</strong><br />
● 1994 - TRCA retains Terraprobe to complete a slope stability<br />
assessment behind 42 <strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong> following collapse of fence.<br />
Note: tree planting <strong>and</strong> gravel blanket placed previous year by TRCA T<br />
(1993)<br />
● 1997 - Terraprobe submits report of updated slope stability assessment<br />
for 42 <strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong>, following complaint of additional loss of<br />
property. Buttress <strong>and</strong> plantings subsequently installed (1998)<br />
● 2001 - Terraprobe completes updated slope stability assessment for 42<br />
<strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong> following complaint of additional loss of property.<br />
Timber retaining wall, gravel <strong>and</strong> plantings subsequently installed<br />
(2003)<br />
● 2007 - Slope stability assessment for 30-48 <strong>Royal</strong> <strong>Rouge</strong> <strong>Trail</strong> by<br />
Terraprobe commences following petition by residents (2004)<br />
● 2008 – Terraprobe presents results of study to community<br />
Terraprobe Ltd.<br />