05.08.2014 Views

TOPAX DE Operation & Maintenance Instructions

TOPAX DE Operation & Maintenance Instructions

TOPAX DE Operation & Maintenance Instructions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

To activate all resistances jumpers have to be attached to the <strong>TOPAX</strong> <strong>DE</strong> (see following<br />

illustration). For this purpose the device front has to be unscrewed and flipped up.<br />

CAUTION!<br />

WARNING!<br />

CAUTION!<br />

You must only insert the 120 ohm Pull-up/Pull-down resistances into one <strong>TOPAX</strong><br />

<strong>DE</strong>, the last one in the network. (No resistances are inserted in its delivered<br />

state).<br />

WARNING!<br />

Before opening switch the device without fail to zero-potential!!<br />

120 ohm Pull-up Pull-down resistance note jumper on the bridges<br />

not installed (delivered state) 2, 4 and 6 (right and left)<br />

installed (on the last device) 2, 3 and 5 (right and left)<br />

View of the display board for the jumper field for the Pull-up/Pull-down resistances (shown<br />

in the delivered state):<br />

Connector<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

left<br />

right<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

42 | Operating Manual <strong>TOPAX</strong> <strong>DE</strong> | Data readout

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!