NVC in Carpentry and Joinery - NBTE
NVC in Carpentry and Joinery - NBTE
NVC in Carpentry and Joinery - NBTE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>NVC</strong> <strong>in</strong> <strong>Carpentry</strong> <strong>and</strong> Jo<strong>in</strong>ery (Draft)<br />
PROGRAMME: PROGRAMME: NATIONAL VOCATIONAL CERTIFICATE IN CARPENTRY AND JOINERY<br />
COURSE: FORM WORK I COURSE CODE: CPJ CONTACT HOURS: 2-0-1<br />
GOAL: This module is designed to provide the tra<strong>in</strong>ee with the knowledge <strong>and</strong> skills <strong>in</strong> the design, construction <strong>and</strong> erection of various temporary<br />
Form Work<br />
COURSE SPECIFICATION: Theoretical Contents:<br />
General Objective: 1.0 Know the differences between pre-cast <strong>and</strong> <strong>in</strong> situ work.<br />
WEEK Specific Learn<strong>in</strong>g Objective Teachers Activities Learn<strong>in</strong>g<br />
Resources<br />
1.1 Def<strong>in</strong>e formwork <strong>and</strong> state its<br />
purpose <strong>in</strong> build<strong>in</strong>g <strong>and</strong> civil<br />
eng<strong>in</strong>eer<strong>in</strong>g work.<br />
1.2 Expla<strong>in</strong> the follow<strong>in</strong>g terms<br />
used <strong>in</strong> formwork construction:-<br />
In-situ, pre-cast, stripp<strong>in</strong>g,<br />
strik<strong>in</strong>g, sett<strong>in</strong>g/set, cure, mould.<br />
State the general requirements of<br />
formwork, e.g.<br />
a. produce the shape of concrete<br />
structure required;<br />
b. rigidity <strong>and</strong> structural stability;<br />
c. ease of erection <strong>and</strong> stripp<strong>in</strong>g;<br />
d. if built up, boards should be<br />
sufficiently light to prevent<br />
loss of f<strong>in</strong>ished materials<br />
from the concrete.<br />
• Use question <strong>and</strong><br />
answer to discuss the<br />
purpose of formwork<br />
<strong>in</strong> build<strong>in</strong>g <strong>and</strong> civil<br />
eng<strong>in</strong>eer<strong>in</strong>g works.<br />
Practical Contents:<br />
Specific Learn<strong>in</strong>g<br />
Objective<br />
1.4 Sketch/draw<br />
details of<br />
formwork<br />
construction for<br />
the follow<strong>in</strong>g <strong>in</strong>situ<br />
concrete<br />
items:<br />
(a) beam (b) floor<br />
<strong>and</strong> roof slab (c)<br />
l<strong>in</strong>tel (d) wall (e)<br />
concrete straight<br />
flight stair <strong>and</strong><br />
l<strong>and</strong><strong>in</strong>g (f) site<br />
concrete (German<br />
floor) (g) column -<br />
square, circular<br />
<strong>and</strong> shape (k)<br />
tapered<br />
foot<strong>in</strong>g/foundation<br />
base <strong>and</strong> (j)<br />
balconies.<br />
Teachers Activities<br />
Learn<strong>in</strong>g<br />
Resources<br />
39