INSTALLATION INSTRUCTIONS - Lennox
INSTALLATION INSTRUCTIONS - Lennox
INSTALLATION INSTRUCTIONS - Lennox
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Vent Pipe Sizing Worksheet<br />
Step 1<br />
Step 2<br />
Step 3<br />
Step 4<br />
Step 5<br />
Step 6<br />
Proposed vent pipe size : ______<br />
Termination kit catalog number : _____________<br />
Vent pipe equivalency value from table 3 : ______<br />
Total number of 90° elbows required (indoors and outdoors)<br />
______ X 5 = ______ equivalent feet of pipe<br />
Total number of 45° elbows required (indoors and outdoors)<br />
______ X 2.5 = ______ equivalent feet of pipe<br />
Linear feet of straight pipe required : ______<br />
Add equivalent feet of vent pipe listed in<br />
steps 2 through 5.<br />
Equivalent Feet<br />
TOTAL<br />
If the total is equal to, or less than, the allowable maximum given in table 5, the proposed pipe size is acceptable. If the<br />
total exceeds the maximum allowed vent pipe length, repeat the process above using the next larger diameter pipe until<br />
an acceptable total is achieved.<br />
NOTE − In Direct Vent systems, total the equivalent length of either the exhaust OR intake piping run, depending upon which<br />
will be LONGER. Intake and exhaust pipe diameter must be the same size and must be terminated in the same pressure<br />
zone. Intake and exhaust pipe should be roughly the same length.<br />
G43UF Start−Up & Performance Check List<br />
Job Name<br />
Job Location<br />
Installer<br />
Unit Model No.<br />
Serial No.<br />
Job No.<br />
City<br />
City<br />
Technician<br />
Heating Section<br />
Electrical Connections Tight?<br />
Supply Voltage<br />
Blower Motor H.P.<br />
Blower Motor Amps<br />
Gas Piping Connections<br />
Tight & Leak−Tested?<br />
Fuel Type: Natural Gas?<br />
LP/Propane Gas?<br />
Furnace Btu Input<br />
Line Pressure<br />
Regulator Pressure w.c. − Nat.:<br />
w.c. − LP/Propane<br />
Flue Connections Tight?<br />
Proper Draft?<br />
Condensate Connections Tight?<br />
Combustion Gas Tested?<br />
Fan Control Setting<br />
CO 2 CO<br />
(45 Seconds Fixed On)<br />
Fan Control Off Setting<br />
Temperature Rise<br />
Filter Clean & Secure?<br />
Vent Clear?<br />
Thermostat<br />
Calibrated? Heat Anticipator Properly Set? Level?<br />
Date<br />
State<br />
State<br />
Page 46