Alternative Project Delivery - Texas Water Development Board
Alternative Project Delivery - Texas Water Development Board
Alternative Project Delivery - Texas Water Development Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table of Contents<br />
VI. School Districts..................................................................................................8<br />
VII. Barriers .............................................................................................................9<br />
Constitution.........................................................................................................9<br />
Professional Services...........................................................................................9<br />
Plan Approval......................................................................................................9<br />
Procurement Process...........................................................................................9<br />
Conclusions .......................................................................................................10<br />
VIII. <strong>Project</strong>s..........................................................................................................10<br />
Schertz/Seguin Local Government Corporation...............................................10<br />
City of Eagle Pass .............................................................................................10<br />
Brownsville PUB...............................................................................................10<br />
San Antonio <strong>Water</strong> System...............................................................................11<br />
Bexar Metropolitan <strong>Water</strong> District....................................................................11<br />
Conclusion...............................................................................................................11<br />
3. TRAINING/WORKSHOP<br />
Workshop Agenda................................................................................................. 3-1<br />
Questions for Discussion....................................................................................... 3-2<br />
Comparison of Traditional vs. <strong>Alternative</strong> <strong>Project</strong> <strong>Delivery</strong> Approaches............ 3-3<br />
Potential Areas of Concern................................................................................... 3-6<br />
Participant Evaluation........................................................................................... 3-8<br />
APPENDIX<br />
Appendix A - <strong>Alternative</strong> <strong>Delivery</strong> Methods Presentation - Part A<br />
Appendix B - <strong>Alternative</strong> <strong>Delivery</strong> Methods Presentation - Part B<br />
4. ISSUES CHECKLIST<br />
Introduction...............................................................................................................1<br />
"What You Should Know"........................................................................................1<br />
Design-Bid-Build (DBB) ....................................................................................1<br />
Design-Build (DB)..............................................................................................1<br />
Design-Build-Operate (DBO).............................................................................2<br />
Descriptions of <strong>Delivery</strong> Methods ............................................................................3<br />
Design-Bid-Build (DBB) ....................................................................................3<br />
Design-Build (DB)..............................................................................................4<br />
Design-Build-Operate (DBO).............................................................................5<br />
Summary...................................................................................................................6<br />
This report has been prepared for the use of the client for the specific purposes identified in the<br />
report. The conclusions, observations and recommendations contained herein attributed to<br />
R. W. Beck, Inc. (R. W. Beck) constitute the opinions of R. W. Beck. To the extent that<br />
statements, information and opinions provided by the client or others have been used in the<br />
preparation of this report, R. W. Beck has relied upon the same to be accurate, and for which no<br />
assurances are intended and no representations or warranties are made. R. W. Beck makes no<br />
certification and gives no assurances except as explicitly set forth in this report.<br />
Copyright 2002, R. W. Beck, Inc.<br />
All rights reserved.<br />
2 <strong>Texas</strong> <strong>Water</strong> <strong>Development</strong> <strong>Board</strong> TOC