Section 4<br />

Pursuant to stringent timing requirements, the Partnership Agreement calls for the<br />

phased reduction of pumping from eleven existing wellfields serving the Tampa Bay<br />

region as new water sources are developed. The Agreements specifically require TBW<br />

to reduce its average daily withdrawals from the eleven wellfields.<br />

The <strong>Water</strong> Master Plan projects currently being developed or under construction<br />

include the following:<br />

• 66 mgd surface water treatment plant;<br />

• 25 mgd seawater desalination plant;<br />

• 9 mgd groundwater treatment plant;<br />

• 15 billion gallon offstream reservoir; and<br />

• 47 miles of large diameter pipe.<br />

These projects include 174 environmental/construction permits and acquisition of land<br />

rights on 266 parcels of land. The budget for the construction of these projects<br />

exceeds $609.<br />

TBW’s objective in executing the <strong>Water</strong> Master Plan was obtaining the highest water<br />

quality at the lowest possible cost for its members. It evaluated the entire capital<br />

improvement program for opportunities to reduce costs through alternative project<br />

delivery methods. Based on the evaluation, TBW selected DBO project delivery for<br />

the surface water plant as having the most benefit to the Authority.<br />

On April 10, 2000, the TBW board of directors approved the $135 million agreement,<br />

which is one of the largest water treatment DBO contracts in the United States and an<br />

essential component of the plan to meet the region’s need for new water supplies. The<br />

contract includes approximately $79 million in capital costs and $56 million in<br />

operation and maintenance fees over the initial 15-year term and a five year option<br />

period. The new water treatment plant will treat water at a rate of 53.8 cents per<br />

gallon, significantly lower than earlier project cost estimates.<br />

Facility:<br />

Developer:<br />

<strong>Project</strong> Summary<br />

66 MGD surface water treatment plant<br />

U.S. Filter, CDM & Clark Construction (“USFOS/CDM”)<br />

• USFOS/CDM will design, build and operate a filtration/ozonation plant for $80<br />

million.<br />

• TBW retains ownership and liability for future capital requirements.<br />

• TBW provides financing for the project.<br />

• Company guarantees on project.<br />

Benefits<br />

• Risk mitigation<br />

• Performance guarantees<br />

4-8 <strong>Texas</strong> <strong>Water</strong> <strong>Development</strong> <strong>Board</strong> B1381-Sect4