Section 4<br />
Pursuant to stringent timing requirements, the Partnership Agreement calls for the<br />
phased reduction of pumping from eleven existing wellfields serving the Tampa Bay<br />
region as new water sources are developed. The Agreements specifically require TBW<br />
to reduce its average daily withdrawals from the eleven wellfields.<br />
The <strong>Water</strong> Master Plan projects currently being developed or under construction<br />
include the following:<br />
• 66 mgd surface water treatment plant;<br />
• 25 mgd seawater desalination plant;<br />
• 9 mgd groundwater treatment plant;<br />
• 15 billion gallon offstream reservoir; and<br />
• 47 miles of large diameter pipe.<br />
These projects include 174 environmental/construction permits and acquisition of land<br />
rights on 266 parcels of land. The budget for the construction of these projects<br />
exceeds $609.<br />
TBW’s objective in executing the <strong>Water</strong> Master Plan was obtaining the highest water<br />
quality at the lowest possible cost for its members. It evaluated the entire capital<br />
improvement program for opportunities to reduce costs through alternative project<br />
delivery methods. Based on the evaluation, TBW selected DBO project delivery for<br />
the surface water plant as having the most benefit to the Authority.<br />
On April 10, 2000, the TBW board of directors approved the $135 million agreement,<br />
which is one of the largest water treatment DBO contracts in the United States and an<br />
essential component of the plan to meet the region’s need for new water supplies. The<br />
contract includes approximately $79 million in capital costs and $56 million in<br />
operation and maintenance fees over the initial 15-year term and a five year option<br />
period. The new water treatment plant will treat water at a rate of 53.8 cents per<br />
gallon, significantly lower than earlier project cost estimates.<br />
Facility:<br />
Developer:<br />
<strong>Project</strong> Summary<br />
66 MGD surface water treatment plant<br />
U.S. Filter, CDM & Clark Construction (“USFOS/CDM”)<br />
• USFOS/CDM will design, build and operate a filtration/ozonation plant for $80<br />
million.<br />
• TBW retains ownership and liability for future capital requirements.<br />
• TBW provides financing for the project.<br />
• Company guarantees on project.<br />
Benefits<br />
• Risk mitigation<br />
• Performance guarantees<br />
4-8 <strong>Texas</strong> <strong>Water</strong> <strong>Development</strong> <strong>Board</strong> B1381-Sect4