11.10.2014 Views

Alternative Project Delivery - Texas Water Development Board

Alternative Project Delivery - Texas Water Development Board

Alternative Project Delivery - Texas Water Development Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table of Contents<br />

<strong>Project</strong> Summary.............................................................................................4-8<br />

Benefits............................................................................................................4-8<br />

Present Status...................................................................................................4-9<br />

APPENDIX<br />

Appendix A - Glossary<br />

List of Tables<br />

Table 1-1 Global <strong>Water</strong> Firms..................................................................................1-5<br />

Table 1-2 U.S. Privatization Firms...........................................................................1-6<br />

Table 1-3 Urban <strong>Water</strong> Council Survey, Public/Private Partnerships......................1-8<br />

Table 2-1 Comparison of Traditional vs. <strong>Alternative</strong> <strong>Project</strong><br />

<strong>Delivery</strong> Approaches..............................................................................2-19<br />

Table 3-1 Potential Areas of Concern, Traditional Versus DB/DBO<br />

Approach on Public <strong>Project</strong>s....................................................................3-5<br />

List of Figures<br />

Figure 2-1 Traditional DBB <strong>Project</strong> Structure...........................................................2-3<br />

Figure 2-2 DB <strong>Project</strong> Structure.................................................................................2-7<br />

Figure 2-3 DBO <strong>Project</strong> Structure............................................................................2-13<br />

Figure 2-4 BOOT <strong>Project</strong> Structure.........................................................................2-17<br />

Figure 3-1 Traditional Contracting Approach for <strong>Water</strong> Treatment Facility<br />

Sample Schedule ......................................................................................3-3<br />

Figure 3-2 DB or DBO Approach for <strong>Water</strong> Treatment Facility<br />

Sample Schedule ......................................................................................3-4<br />

This report has been prepared for the use of the client for the specific purposes identified in the<br />

report. The conclusions, observations and recommendations contained herein attributed to<br />

R. W. Beck, Inc. (R. W. Beck) constitute the opinions of R. W. Beck. To the extent that<br />

statements, information and opinions provided by the client or others have been used in the<br />

preparation of this report, R. W. Beck has relied upon the same to be accurate, and for which no<br />

assurances are intended and no representations or warranties are made. R. W. Beck makes no<br />

certification and gives no assurances except as explicitly set forth in this report.<br />

Copyright 2002, R. W. Beck, Inc.<br />

All rights reserved.<br />

B1381 R. W. Beck 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!