Alternative Project Delivery - Texas Water Development Board
Alternative Project Delivery - Texas Water Development Board
Alternative Project Delivery - Texas Water Development Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table of Contents<br />
<strong>Project</strong> Summary.............................................................................................4-8<br />
Benefits............................................................................................................4-8<br />
Present Status...................................................................................................4-9<br />
APPENDIX<br />
Appendix A - Glossary<br />
List of Tables<br />
Table 1-1 Global <strong>Water</strong> Firms..................................................................................1-5<br />
Table 1-2 U.S. Privatization Firms...........................................................................1-6<br />
Table 1-3 Urban <strong>Water</strong> Council Survey, Public/Private Partnerships......................1-8<br />
Table 2-1 Comparison of Traditional vs. <strong>Alternative</strong> <strong>Project</strong><br />
<strong>Delivery</strong> Approaches..............................................................................2-19<br />
Table 3-1 Potential Areas of Concern, Traditional Versus DB/DBO<br />
Approach on Public <strong>Project</strong>s....................................................................3-5<br />
List of Figures<br />
Figure 2-1 Traditional DBB <strong>Project</strong> Structure...........................................................2-3<br />
Figure 2-2 DB <strong>Project</strong> Structure.................................................................................2-7<br />
Figure 2-3 DBO <strong>Project</strong> Structure............................................................................2-13<br />
Figure 2-4 BOOT <strong>Project</strong> Structure.........................................................................2-17<br />
Figure 3-1 Traditional Contracting Approach for <strong>Water</strong> Treatment Facility<br />
Sample Schedule ......................................................................................3-3<br />
Figure 3-2 DB or DBO Approach for <strong>Water</strong> Treatment Facility<br />
Sample Schedule ......................................................................................3-4<br />
This report has been prepared for the use of the client for the specific purposes identified in the<br />
report. The conclusions, observations and recommendations contained herein attributed to<br />
R. W. Beck, Inc. (R. W. Beck) constitute the opinions of R. W. Beck. To the extent that<br />
statements, information and opinions provided by the client or others have been used in the<br />
preparation of this report, R. W. Beck has relied upon the same to be accurate, and for which no<br />
assurances are intended and no representations or warranties are made. R. W. Beck makes no<br />
certification and gives no assurances except as explicitly set forth in this report.<br />
Copyright 2002, R. W. Beck, Inc.<br />
All rights reserved.<br />
B1381 R. W. Beck 3