19.10.2014 Views

CHAPTER 27 • Statistical Process Control

CHAPTER 27 • Statistical Process Control

CHAPTER 27 • Statistical Process Control

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>27</strong>-40 <strong>CHAPTER</strong> <strong>27</strong> • <strong>Statistical</strong> <strong>Process</strong> <strong>Control</strong><br />

TABLE <strong>27</strong>.8 Proportions of workers absent during four weeks<br />

M T W Th F M T W Th F<br />

Workers absent 129 121 117 109 122 119 103 103 89 105<br />

Proportion pˆ 0.131 0.123 0.119 0.110 0.124 0.121 0.104 0.104 0.090 0.106<br />

M T W Th F M T W Th F<br />

Workers absent 99 92 83 92 92 115 101 106 83 98<br />

Proportion pˆ 0.100 0.093 0.084 0.093 0.093 0.117 0.102 0.107 0.084 0.099<br />

the chart based on the new data. If the rate does not decline further (or even rises<br />

again as the effect of your actions wears off), you will consider further changes.<br />

Example <strong>27</strong>.13 is a bit oversimplified. The number of workers available did<br />

not remain fixed at 987 each day. Hirings, resignations, and planned vacations<br />

change the number a bit from day to day. The control limits for a day’s pˆ depend<br />

on n, the number of workers that day. If n varies, the control limits will move in<br />

and out from day to day. Software will do the extra arithmetic needed for a different<br />

n each day, but as long as the count of workers remains close to 987, the<br />

greater detail will not change your conclusion.<br />

A single p chart for all workers is not the only, or even the best, choice in this<br />

setting. Because of the important role of supervisors in absenteeism, it would be<br />

wise to also keep separate p charts for the workers under each supervisor. These<br />

charts may show that you must reassign some supervisors.<br />

0.18<br />

0.16<br />

UCL<br />

Proportion absent<br />

0.14<br />

0.12<br />

0.10<br />

LCL<br />

x<br />

x<br />

x<br />

x<br />

x<br />

0.08<br />

x<br />

x<br />

0.06<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20<br />

Day<br />

FIGURE <strong>27</strong>.16<br />

p chart for daily proportion of workers absent over a four-week period, for Example <strong>27</strong>.13. The<br />

lack of control shows an improvement (decrease) in absenteeism. Update the chart to continue<br />

monitoring the process.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!