20.10.2014 Views

Request for Proposal (RFP) Ref: RFP-2009-001 Date: 5 ... - UNDP

Request for Proposal (RFP) Ref: RFP-2009-001 Date: 5 ... - UNDP

Request for Proposal (RFP) Ref: RFP-2009-001 Date: 5 ... - UNDP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex IV<br />

Tech. Form -3 Description of Technical Approach, Proposed Methodology<br />

and Management Work Plan<br />

B.3 - Management Work Plan<br />

In this chapter you should propose the main activities of the assignment, their content and duration,<br />

phasing and interrelations, milestones (including interim approvals by the Employer), and delivery dates<br />

of the reports. The proposed work plan should be consistent with the technical approach and<br />

methodology, showing understanding of the TOR and ability to translate them into a feasible working<br />

plan. A list of the final documents, including reports, drawings, and tables to be delivered as final output,<br />

should be included here. The work plan should be consistent with the Work Schedule of Form, Tech.<br />

Form -7.<br />

.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!