- Page 1 and 2: Kazakhstan upstream oil and gas tec
- Page 3: A pragmatic steer for technology de
- Page 7 and 8: KazNTU Izim Dussembayev, Institute
- Page 9 and 10: Technology solutions Over 230 possi
- Page 11 and 12: It would be realistic to expect the
- Page 13 and 14: Learning and skills development in
- Page 15 and 16: THE INTRODUCTION THE FUNDAMENTALS F
- Page 17 and 18: Roadmap development Project objecti
- Page 19 and 20: Stage 3 - the way forward The work
- Page 21 and 22: The causes of the challenges facing
- Page 23 and 24: 4.2 Field Management−Optimise Rec
- Page 25 and 26: VALUE TTA 1 RESERVOIR CHARACTERISAT
- Page 27 and 28: The technology solutions and their
- Page 29 and 30: The technology solutions and their
- Page 31 and 32: The technology solutions and their
- Page 33 and 34: Introducing the topic maps Introduc
- Page 35 and 36: 1. Reservoir characterisation Reser
- Page 37 and 38: 1.1 Seismic data acquisition and pr
- Page 39 and 40: NOW 2015 2020 2025 TECHNOLOGIES AND
- Page 41 and 42: 1.2 Reservoir description - geology
- Page 43 and 44: NOW 2015 2020 2025 Basin modelling
- Page 45 and 46: 1.3 Well logging and in-well monito
- Page 47 and 48: NOW 2015 2020 2025 Wireline formati
- Page 49 and 50: 1.4 Core analysis and data interpre
- Page 51 and 52: NOW 2015 2020 2025 TECHNOLOGIES AND
- Page 53 and 54: 1.5 Fluid property analysis Challen
- Page 55 and 56:
NOW 2015 2020 2025 TECHNOLOGIES AND
- Page 57 and 58:
2. Field equipment Designing and bu
- Page 59 and 60:
2.1 Corrosion plus equipment and ma
- Page 61 and 62:
NOW 2015 2020 2025 Corrosion resist
- Page 63 and 64:
2.2 Operating in the ice and during
- Page 65 and 66:
NOW 2015 2020 2025 TECHNOLOGIES AND
- Page 67 and 68:
2.3 Management of sulphur Challenge
- Page 69 and 70:
NOW 2015 2020 2025 Sulphur separati
- Page 71 and 72:
3. Fluid flow and processing Flow a
- Page 73 and 74:
3.1 Flow assurance and sand control
- Page 75 and 76:
NOW 2015 2020 2025 3D flow modellin
- Page 77 and 78:
3.2 Water management Challenge comm
- Page 79 and 80:
NOW 2015 2020 2025 Diagnostic evalu
- Page 81 and 82:
4. Wells and field management The m
- Page 83 and 84:
4.1 Drilling and well costs Challen
- Page 85 and 86:
As for the second challenge, most o
- Page 87 and 88:
NOW 2015 2020 2025 Casing and liner
- Page 89 and 90:
4.2 Field management: optimised rec
- Page 91 and 92:
NOW 2015 2020 2025 Well stimulation
- Page 93 and 94:
5. HSE and operations The oil indus
- Page 95 and 96:
5.1 Emergency response and disaster
- Page 97 and 98:
NOW 2015 2020 2025 Quantitative ris
- Page 99 and 100:
5.2 Operational HSE risk reduction
- Page 101 and 102:
NOW 2015 2020 2025 Breathing appara
- Page 103 and 104:
5.3 Environmental impact Challenge
- Page 105 and 106:
NOW 2015 2020 2025 Chemical and mem
- Page 107 and 108:
Technology and R&D n R&D funding ne
- Page 109 and 110:
GOVERNANCE Process platform: govern
- Page 111 and 112:
Capabilities across the 15 prime ch
- Page 113 and 114:
GOVERNANCE NOW 2015 2020 2025 Proce
- Page 115 and 116:
INDUSTRY ENABLERS SKILLS R&D GOVERN