Design specifications<br />

Sealed joints<br />

(only possible with minimum roof pitch of 2.9°)<br />

The profiled sheets are installed in a precise<br />

sequence according to the assembly in struc -<br />

tions. The critical tightness of seal is achieved<br />

by three rows of silicone in the joint zone of<br />

the individual profiled sheets plus two rows<br />

of sealing rivets. The overlap is 200 mm.<br />

Kalzip and the substructure, the thermal<br />

barrier pads under the clips provide sufficient<br />

separation.<br />

On concrete substructures a suitably<br />

anchored steel section or timber batten<br />

(minimum thickness 40 mm) must be<br />

inserted.<br />

Drilling pattern 2<br />

6.14 Cantilevers/clip bars<br />

Drilling pattern 1<br />

1<br />

2<br />

Direction of assembly<br />

If the roof is to protrude at the eaves, additional<br />

substructures are dispensable providing<br />

that the clips are installed as clip bars.<br />

They are fixed to the roof with appropriate<br />

length and serve as support for the Kalzip<br />

sheets as well as a fixing for the gutter<br />

(see table of roof projections and 6.16).<br />

Drilling pattern 2<br />

2<br />

4<br />

6.15 Installation rules<br />

Drilling pattern 2<br />

1<br />

3<br />

Individual verification is required in each<br />

and every case. Roof projections are not<br />

accessible. The ends of the Kalzip sheets<br />

must be joined with an eaves angle. The<br />

length of the clip bars is outlined in the<br />

diagram opposite.<br />

eaves angle as<br />

lateral stiffener<br />

Drilling pattern 2<br />

6.13 Substructures<br />

Drilling pattern 1<br />

Kalzip roofs can be installed on all kinds<br />

of substructures. With metal or timber<br />

substructures the clips are directly fixed to<br />

the substructure. With metal substructures<br />

contact corrosion must be taken into con -<br />

sideration. As, with the exception of Kalzip<br />

AF, there is no direct contact between<br />

Drilling pattern 2<br />

b = Fixing distance depends on substructure<br />

Clip bar spacings<br />

Roof projection (a)<br />

over last support<br />

1 m<br />

(0.5 m)*<br />

1.5 m<br />

(0.9 m)*<br />

Kalzip 65/... 50/...<br />

305 333 400 422 429<br />

every every every every every<br />

2nd sheet 2nd sheet 2nd sheet sheet sheet<br />

every every every impossible impossible<br />

sheet sheet sheet<br />

Depending on the construction width of the Kalzip sheets and the desired roof projection the clip bars<br />

must be fitted to each or every second seam. The table is applicable for a snow load of 0.75 kN/m 2 .<br />

*Values apply to clip type L10.<br />