• Maintaining/replacing signage<br />
• Installing/Straightening Guide Posts<br />
• Carryout Digouts, Edge Breaks and Deformations on Main Roads<br />
• Reseal Prep Link 94 & Link 08<br />
CRADLE MOUNTAIN WATER<br />
• Continued monitoring of Currie, Grassy water quality<br />
• Maintenance of Wetlands and raw sewage ponds<br />
• Water Reticulation Network Maintenance<br />
PRIVATE WORKS<br />
• Prep for Sealing D/way- Inga Horn<br />
• JB Swift Australia Driveway Upgrade<br />
REFUSE DISPOSAL SITE – PARENNA<br />
Compaction of putrescibles waste at the Charles Street Waste Management Facility<br />
commenced 1 st July 2007. The first bale was positioned in the prepared cell, at<br />
Parenna, on 25 July 2007.<br />
The average weight of a bale of putrescibles waste is 560kg, with a volume of<br />
approximately 0.75 cubic metres<br />
JULY 2009 TO JUNE 2010<br />
DEPOSIT DATE NO. BALES TOTAL VOLUME M 3<br />
July 2009 to June 2010 1410 1057.5<br />
JULY 2010 TO JUNE <strong>2011</strong><br />
DEPOSIT DATE NO. BALES TOTAL VOLUME M 3<br />
7 July 2010 75 56.25<br />
30 August 2010 190 142.50<br />
30 September 2010 0 0<br />
31 October 2010 0 0<br />
26 November 2010 220 165<br />
10 December 2010 163 122.25<br />
TOTAL 428 321<br />
This report is provided for <strong>Council</strong>’s information<br />
Michael Brown<br />
DIRECTOR OF WORKS AND ENGINEERING SERVICES<br />
Recommendation:<br />
That the Information Report be received and noted.<br />
- 15 - Ordinary <strong>Council</strong> Meeting – <strong>18</strong> <strong>January</strong> <strong>2011</strong>