The bottom of the river is composed by pebble and gravel material. There are outputs of<br />

rocky breeds in the river. The analysis of the river bad processes [6] specifies absence<br />

of rearrangements of a base contour, which could be determined by existing methods.<br />

Therefore account of the river bad processes of strains in a hydraulic model was not<br />

conducted. The channel deep also does not call difficulties for navigation, therefore<br />

special dragging work on this section of the river were never conducted. The absence of<br />

the hydro technical work on recess of bottom cannot cause formation of jams of ice.<br />

The accounts of current are conducted on one-dimensional and two-dimensional<br />

models. As boundary conditions the daily of water discharge on a hydrometric post<br />

Krestovskoe were used. It is located in 100 Km above on current of the river. On this<br />

section of the river the inflow of water is very small, on a comparison with volume of<br />

water of the Lena River. It was taken only in flow of the Nuy River, the discharge of<br />

water, which reach 2000 m 3 /s. The discharge of a high water on the Nuy river passes<br />

always earlier, than on the Lena. During period of a high water on the Lena the<br />

discharge in the Nuy is reduced up to tens m 3 /s. It on two orders is less than a volume of<br />

flow of the main river. The levels of waters used for calibration of a model and a<br />

selection of factors of a roughness, undertook on being available a hydrometric posts.<br />

The thickness of ice on a hydrometric post in winter period was taken into account.<br />

The modern technique of realization of accounts because of equations of the Saint-<br />

Venant assumes semi-automatic construction of cross section of a channel and hybrid<br />

irregular settlement grids [7]. The settlement grids consist of triangular and four-coal<br />

cells. In consequent on special algorithms they automatically interpolate a contour in<br />

knots of a grid [8]. For region of city Lensk on a site by a valley of 150 km were<br />

constructed both only triangular, and special hybrid grids. The hybrid grids consist of<br />

curvilinear four-coal cells in a channel and triangular on cells (fig. 2). The pitch of a<br />

settlement grid has made for a channel 50 − 150 m, for flood plane 150 − 500 m. The<br />

accounts were conducted under the obvious scheme of disintegration of ruptures [9,10]<br />

and on implicit on time to the scheme [2,4,11].<br />

Fig. 2. The digital nets of the computer model<br />