04.11.2014 Views

Session B.pdf - Clarkson University

Session B.pdf - Clarkson University

Session B.pdf - Clarkson University

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

- maximum length of an ice field is known;<br />

- time (date) of a beginning of formation of a jam and its destruction are known;<br />

- on a considered site of the river a jam only one, but can form in different places of<br />

a site;<br />

- the total discharge of water and ice on the source boundaries of settlement area<br />

are known.<br />

With allowance for of listed above assumptions the one-dimensional mathematical<br />

model both program of account of formation and development of jams in region of city<br />

Lensk was developed. On this site 6 constants of places of jams are known (fig. 1).<br />

Because of digital model of a relief and with the help of especially of developed<br />

program for a site 95 cross sections of a channel and valley of the river were<br />

constructed. The cross sections are located on a distance about 1.5 Km from each other,<br />

with a pitch 25 m between verticals (on some cross sections the number of verticals<br />

reached 400).<br />

Cross sections have formed the basis for construction of a one-dimensional<br />

mathematical model of current, which has allowed to expect passing high waters on a<br />

considered site, including formation of ice jams. The model is based on a numerical<br />

solution of the one-dimensional equations of the Saint-Venant on algorithm [1, 13] and<br />

is supplemented by an elementary model of increase of length of a jam depending on<br />

concentration of ice, approaching to a jam, and flow rate at a leading edge of a jam.<br />

Basic data for a model are:<br />

- hydrograph in a first cross section, as which was accepted of the hydrograph of a<br />

post Krestovsky, with allowance for of lag channel, equal to 12 hours;<br />

- hydrograph of the river Nuy (was set to constants: Q = 100 m 3 /s);<br />

- factor of concentration of ice in a first cross section (was accepted in a range<br />

0,5 − 0,7);<br />

- place of formation of a jam (one from four specific, since of an island<br />

Batamaisky);<br />

- factors of a roughness (on Manning) the channels (n = 0,023) and flood plane of<br />

the river (n = 0,05) in a stream without ice (were determined by calibration of a<br />

model under the fact sheet);<br />

- additional factor of a roughness of a jam (ice surface), which was determined on<br />

full-scale dates for winter conditions with allowance for adjustments on an<br />

increased roughness of ice in a jam (was accepted equal n = 0,03);<br />

- maximum length of a jam (was accepted under the fact sheet or more);<br />

- time of a beginning of formation and the destructions of a jam were accepted on<br />

actual approximate dates.<br />

On the last boundary of a stream it was put the «not reflecting» boundary condition<br />

appropriate to relation between of discharges and levels accordance the equation of<br />

Shezy for known of slope of a water surface (was accepted I = 0,0001).<br />

375

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!