6. Control Compartment<br />

a. Outdoor enclosure.<br />

b. Turbine control panel.<br />

c. Generator control panel and protection panel.<br />

a. Motor control centre.<br />

b. air conditioning system.<br />

7. The bidder shall assess the potential impact of air quality, designs the air filter<br />

system appropriately and guarantees its long-term performance.<br />

The bidder shall also supply, install & commission (a) Continuous Emissions Monitoring<br />

Module; and (b) standard weather station for measuring wind velocity & direction and<br />

ambient temperature, pressure & Relative Humidity. Sensors shall be installed in suitable<br />

location as per GT designer's recommendation and calibrated & interfaced with plant<br />

control system. Ambient Temperature, Pressure & Relative Humidity shall be used during<br />

performance tests.<br />

2.1.3 Emergency Diesel Generating Set<br />

One (1) set of emergency diesel generating set complete with ancillary equipment shall<br />

be of minimum 500 kVA [pf 0.80] having diesel storage capacity for 8 hrs continuous<br />

operation for supplying power to essential auxiliaries. EDG shall be of automatic starting<br />

system [compressed air/ Battery] including quick start & loading capability. The starting<br />

system shall be capable of carrying out at least five (5) consecutive start without auxiliary<br />

power supply.<br />

2.1.4 Natural Gas Booster Compressors<br />

The Gas Booster Compressor (GCB) manufactured either by MAN Turbo, Germany or<br />

Atlas Coppco, USA , shall be of well proven design and the offered model of GCB shall<br />

have satisfactory operating experience outside manufacturer's country for at least 2 (two)<br />

years. <strong>Tender</strong>er shall have to submit at least one certificate (must be from outside<br />

manufacturer's country) from the end users in this respect. These certificate must be<br />

notarized or have authentication from the Chamber of Commerce of the <strong>Tender</strong>er's<br />

country or the Embassy/High commission of the end user’s country situated in Dhaka. In<br />

absence of that in Dhaka, authentication from bidder’s Embassy/High Commission.<br />

The plant shall require centrifugal type gas booster compressors, as the supply pressure<br />

of natural gas at RMS is only 90-150 psig. The capacity of the compressors shall have to<br />

be 2x100% ( one in operation and one standby) and each shall be capable to meet<br />

maximum gas requirement of the plant at all modes of operation [base & peak] & at any<br />

temperature prevailing in the site. Appropriate control, sealing, cooling & anti-surge<br />

system shall have to be provided including compressor house.<br />

The gas booster compressors shall be 6.6 KV motor driven.<br />

2.2 230 Kv Switchgear, Equipment And Transformers<br />

2.2.1 230 Kv Switchgear Equipment<br />

(1) 1 (two) lot of 230 kV circuit breaker [3 phase trip, Dead Tank type] with<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)<br />

10