on the transformer.<br />

The wiring shall be connected at the terminal blocks terminating the outgoing<br />

control cable. The flexible tube of the vapour tension thermometer shall be<br />

covered by a protective tube.<br />

(8) Insulating oil<br />

The insulating oil shall have a sufficient insulation strength, and shall be excellent<br />

in heat conductivity, low in viscosity and pour point, and high in flash point. The<br />

oil shall not cause any corrosion to insulating materials and structured materials of<br />

electrical equipment and shall be chemically stable for long years of use.<br />

Delivery shall be made to Site partly contained in the transformers and partly in<br />

steel drums, according to the method of packing employed. An excess of 10% of<br />

the quantity of oil required for filling transformers shall also be supplied and its<br />

cost shall be included in the price of each transformer.<br />

(9) Skid Base<br />

The transformer shall be provided with a skid base with four (4) steel wheels and<br />

necessary jacks for setting and appropriate devices for locking in position of its<br />

foundation.<br />

5.2 GENERATOR STEP-UP TRANSFORMERS<br />

5.2.1 TYPE AND RATIO<br />

The transformer shall be of single phase, oil immersed, self cooled / forced air<br />

cooled (ONAN/ONAF) by cooling fans, outdoor use type. Ratio of delta star<br />

connection shall be 11 KV to 230 KV on full load condition.<br />

The connection of the three phase bank shall be arranged in vector symbol Ynd11<br />

according to IEC 74-4 and neutral of star connected high tension winding shall be<br />

solidly grounded.<br />

The on load tap changer shall be provided on the high tension winding, and their<br />

ratio shall be as follows:<br />

230 kV(±1.25% x 8)<br />

5.2.2 OUTPUT AND REQUIRED NUMBERS<br />

The maximum continuous rating of the transformer shall met at any taps a total<br />

output of the generator which is connected with the transformer in series as<br />

shown in the attached single line diagram.<br />

The self cooled capacity shall not be less than 75 % of forced air cooled capacity.<br />

5.2.3 IMPEDENCE VOLTAGE<br />

Impedance voltage (+ve seq.) shall be within the range of 15% to 18% on the<br />

forced air cooled rating on the rated tapping (11/230 KV ) and shall be<br />

guaranteed by the Contractor.<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)<br />