2.18 Spare Parts<br />

Spares during Warrantee period<br />

The Contractor shall submit a list of Essential spare parts with OEM Part No. and<br />

consumables to be necessary for maintenance of the unit(s) and other plant<br />

equipment inclusive of emergency use that takes place in the course of operation<br />

(according to the Manufacture's recommendation and guideline) during the<br />

Warranty period (24 months). During the warranty period of 24 months, the<br />

Contractor shall supply all necessary equipment, spare parts,<br />

materials/consumables etc. at his own cost and whether it is listed or not in their<br />

list.<br />

Spares during Long Term Service agreement (LTSA)<br />

The <strong>Tender</strong>er shall, in addition to essential spare parts and consumables for<br />

warrantee period also submit a list of spares for LTSA period (next 4 years after<br />

warrantee period) which reflects the OEM's guidelines and <strong>Tender</strong>er's experience<br />

in the operation and maintenance of the type of equipment proposed. For LTSA<br />

period also the Contractor shall supply all necessary equipment, spare parts,<br />

materials/consumables<br />

2.19 Special Maintenance Tools<br />

The contractor shall provide all special tools including a boroscope set required for<br />

maintenance of the unit and hand them over in good condition to the BOARD. A<br />

list of all such tools shall be incorporated with tender. Contractor shall not be<br />

permitted to use any equipment/ machinery/ tools, which are to be supplied<br />

under the Contract.<br />

2.20 Office equipment<br />

The Contractor shall provide 3(three) Nos of Computer (latest model), each with<br />

Laser Printer, UPS (30 Minutes at full load, Min.), Stabiliser, Standard Tables &<br />

Chairs etc.<br />

2.21 Electrical workshop tools<br />

Current injection test set, Megger, Multimeter, etc.<br />

2.22 Machine Shop equipment & Tools - Deleted<br />

Lathe, Piller drill, Universal miller, Machine hacksaw, Grinding Machine,<br />

Small universal machine tools, Welding set etc.<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)<br />