- Page 1 and 2: BANGLADESH POWER DEVELOPMENT BOARD
- Page 3 and 4: Section 1 Description of The Projec
- Page 5 and 6: Section 2 Scope Of Work Ghorasal 20
- Page 7 and 8: 2.0 Scope of Work. The work stated
- Page 9 and 10: e. Lubrication system integral with
- Page 11: the following features : Type : SF6
- Page 15 and 16: c. One (1) lot 41 5 V common power
- Page 17 and 18: supervisor(s) shall not be responsi
- Page 19 and 20: Section 3 Power Plant Arrangement G
- Page 21 and 22: 3.0 Power Plant Arrangement 3.1 Gen
- Page 23 and 24: 3.3.2.4 Compressor Wet Washing Syst
- Page 25 and 26: The unit shall not trip with voltag
- Page 27 and 28: -One fuel pressure regulating valve
- Page 29 and 30: Brief technical specification: a) O
- Page 31 and 32: Section 4 Generator And Ancillary E
- Page 33 and 34: 4. Generator and Ancillary Equipmen
- Page 35 and 36: The neutral and output ends of each
- Page 37 and 38: 4.2.2 Automatic Voltage Regulator (
- Page 39 and 40: (5) Control circuit isolating conne
- Page 41 and 42: - End terminal :One(1) lot - Ammete
- Page 43 and 44: 2) Incoming Circuit Breaker Cubicle
- Page 45 and 46: 5. TRANSFORMERS 5.1 General 5.1.1 R
- Page 47 and 48: (peak) a. 230 KV CIRCUIT - lightnin
- Page 49 and 50: - 11 KV bushings :75 kV peak The cr
- Page 51 and 52: 5.2.4 WINDING AND INSULATION The fu
- Page 53 and 54: Non segregated bus duct between low
- Page 55 and 56: Section-6 230 KV Switchgear Ghorasa
- Page 57 and 58: 6. 230 kV OUTDOOR SWITCHGEAR, EQUIP
- Page 59 and 60: to phase voltage. g. Integrating ti
- Page 61 and 62: c. The porcelain insulator shall be
- Page 63 and 64:
6.2.4 230 kV CURRENT TRENSFORMERS (
- Page 65 and 66:
(6) Requirements for Design and Con
- Page 67 and 68:
The slenderness ratio shall not exc
- Page 69 and 70:
smooth so that interconnecting part
- Page 71 and 72:
7. 6.6 kV SWITCHGEAR AND LOW TENSIO
- Page 73 and 74:
Each compartment shall have removab
- Page 75 and 76:
Feeder circuit : 450, 200 or 100 A
- Page 77 and 78:
Page 8. CONTROL AND PROTECTION EQUI
- Page 79 and 80:
The unit shall have its own local u
- Page 81 and 82:
1. Exhaust temperature high: 1st st
- Page 83 and 84:
The following remote indications sh
- Page 85 and 86:
e limited to: One (1) lot Overall d
- Page 87 and 88:
NPSH availability is critical, at e
- Page 89 and 90:
All solenoids shall have class F in
- Page 91 and 92:
unit step up transformer control pa
- Page 93 and 94:
9.1 General 9.2 Cable Types 9.2.1 2
- Page 95 and 96:
The single or triplex core 6.6 kV X
- Page 97 and 98:
(1) The cable shall be stranded ann
- Page 99 and 100:
Ground grid shall be mesh type and
- Page 101 and 102:
10. DC POWER SUPPLY SYSTEM Page 10.
- Page 103 and 104:
atteries shall not be less than fol
- Page 105 and 106:
With the battery connected and with
- Page 107 and 108:
11. LIGHTING AND SMALL POWER SUPPLY
- Page 109 and 110:
c. The size shall be adequate to li
- Page 111 and 112:
The boxes to be concealed in the co
- Page 113 and 114:
12. FUEL HANDLING FACILITIES Page 1
- Page 115 and 116:
12.2 Liquid Fuel Handling system Th
- Page 117 and 118:
Section 13 Fire Protection Faciliti
- Page 119 and 120:
13. FIRE PROTECTION FACILITIES 13.1
- Page 121 and 122:
The fire fighting water mains shall
- Page 123 and 124:
COMMUNICATION FACILITIES 14.1 Gener
- Page 125 and 126:
Operator intrusion into an establis
- Page 127 and 128:
Protection for the amplifier shall
- Page 129 and 130:
Section 15 Maintenance Facilities 1
- Page 131 and 132:
15.1 Over head Electric Crane 15.1.
- Page 133 and 134:
(1) Bridge and End Truck Frames The
- Page 135 and 136:
Automatic reset, totally enclosed,
- Page 137 and 138:
e used. The tools and appliances wi
- Page 139 and 140:
16.1 General 16.2 Workshop Test 16.
- Page 141 and 142:
. Bench testing of all accessories
- Page 143 and 144:
The test shall be performed in acco
- Page 145 and 146:
up to six months. (2) Scope of Test
- Page 147 and 148:
The following test shall be carried
- Page 149 and 150:
f. Sample test reports or data shee
- Page 151 and 152:
c. Ratio and HV magnetizating curre
- Page 153 and 154:
equipment is provided to replace th
- Page 155 and 156:
17.1.2 Topographic Surveys 17.1.3 S
- Page 157 and 158:
epeated in the others. 17.1.1 GENER
- Page 159 and 160:
The Contractor shall be responsible
- Page 161 and 162:
The maximum dry density (MDD) for t
- Page 163 and 164:
transport. All concrete, reinforcem
- Page 165 and 166:
The concrete shall be transported a
- Page 167 and 168:
If any pile is in any Fay unsatisfa
- Page 169 and 170:
Column, slab, drain-channel, beam,
- Page 171 and 172:
17.6.10 PLACING The concrete shall
- Page 173 and 174:
a. -Variation from vertical: In the
- Page 175 and 176:
or other internationally accepted m
- Page 177 and 178:
(vi) Slab reinforcement The slab re
- Page 179 and 180:
The Contractor shall repair at his
- Page 181 and 182:
The laying of each length of drain
- Page 183 and 184:
One deep-well pump shall be install
- Page 185 and 186:
(6) Data to be Submitted with Bids
- Page 187 and 188:
Flanges Foundation bolts Other nece
- Page 189 and 190:
Section 18 Building Works 18 Buildi
- Page 191 and 192:
The General Conditions, Tender Draw
- Page 193 and 194:
submission. As described elsewhere
- Page 195 and 196:
All rooms shall be provided proper
- Page 197 and 198:
Surfaces to be welded shall be free
- Page 199 and 200:
18.5.2 Concrete The specifications
- Page 201 and 202:
(1) Timber All timber shall be of b
- Page 203 and 204:
(1) General The metal works will in
- Page 205 and 206:
Glazed ceramic wall tiles shall be
- Page 207 and 208:
All joinery, metal works to be pain
- Page 209 and 210:
Page 19.1 General Spares during War
- Page 211 and 212:
GUIDE LINE For Provision for expert
- Page 213 and 214:
A. Category of Experts required: -M
- Page 215 and 216:
other BOP equipment / machinery (fu
- Page 217 and 218:
any damage part of the equipment or
- Page 219 and 220:
10.7 If as a consequence of force m
- Page 221 and 222:
c) 10% payment of the relevant serv
- Page 223 and 224:
Section 20 Appendixes [Data/ drawin