6. Sump tank<br />

The sump tank allows draining liquid fuel from combustion system and from<br />

exhaust plenum when there is false start. It may be preassembled and includes<br />

the followings<br />

-One tank of 1 m 3 capacity<br />

-One manual pump<br />

Gas Fuel System<br />

FUEL GAS HANDLING FACILITIES<br />

SCOPE OF WORK<br />

The Contractor shall design, manufacture, inspect, test, delivery to the site and<br />

install of natural gas handling facilities with all accessories as specified hereunder<br />

for the plant.<br />

The gas turbine unit shall be furnished with a complete gas fuel system. The gas<br />

handling system including Gas Booster Compressor shall also be provided.<br />

NATURAL GAS SUPPLY SYSTEM<br />

To forward the natural gas from the main gas supply header to the gas turbine<br />

unit and to adjust its supply pressure to normal operating pressure, the<br />

Contractor shall furnish one (1) complete factory assembled skid mounted gas<br />

pressure regulating unit including all accessories and necessary pipe connections<br />

to the BOARD's gas supply header for gas turbine unit.<br />

Each gas handling unit shall comprise at least the following major items:<br />

Gas Booster Compressors (one running and one standby, each having capacity for<br />

meeting total gas requirement at all ambient temperatures with 10% margin)<br />

with necessary sealing, cooling, anti-surge device, proven control system etc.<br />

Inlet strainer<br />

A flow meter with bypass system and with integration<br />

Pressure gauges<br />

Pressure regulating equipment<br />

Safety valve and relief valve<br />

A gas conditioner (scrubber, separator and others as required)<br />

Other equipment for satisfactory completion of the work.<br />

Each unit shall have guaranteed capacity, which matches or exceeds the gas<br />

turbine needs under all load operating conditions at site conditions.<br />

Specification of natural gas is shown on Appendix (Vol 2 of 3)<br />

3.3.2.8 Air Inlet System<br />

The air filtration arrangement shall be multi stage (pre-filter and high efficiency).<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)<br />

28