3.3.2 Gas Turbine And Auxiliaries<br />
The gas turbine generating unit shall be of the simple cycle heavy-duty industrial<br />
packaged type suitable for outdoor installation and operation under the site<br />
conditions as specified in Clause B1 of schedule-B.<br />
Vibration Critical Speed<br />
The radial amplitude of vibration of any rotating shaft under steady state<br />
conditions at normal operating speed shall not exceed the value specified in API<br />
Standard 616 when measured at the shaft local to the bearing. The critical speed<br />
shall be beyond ± 20 % of the operating speed of the engine.<br />
All compartments in the gas turbine generating unit shall be accessible for<br />
inspection and maintenance.<br />
The gas turbine unit shall be designed to burn Liquid fuel as well as natural gas as<br />
specified.<br />
The unit shall be capable of frequent starts and stops without damage to the hot<br />
gas path components and shall be able to run for base load.<br />
3.3.2.1 Starting System<br />
The gas turbine shall have electric motor driven starting equipment capable of<br />
sustaining the complete starting cycle. The starting motor shall be capable of<br />
carrying out at least Five (5) consecutive starting without any harmful effect.<br />
3.3.2.2 Turning Gear<br />
A rotor turning gear shall be provided to minimise thermal distortion of the rotor<br />
after operation and to permit rapid reloading of the unit after a shutdown.<br />
Necessary oil piping and appurtenances shall be included. Turning gear oil piping<br />
system shall be a part of the turbine lubrication system and shall be complete<br />
with all necessary pressure switches or other interlocks to prevent turning gear<br />
operation if lubricating oil pressure drops below than pre-set value. Suitable<br />
housing and safety guard shall be provided for all moving parts of the turning<br />
gear. Turning gear operation shall be indicated on the remote control panels. The<br />
turning gear shall have automatic engaging and disengaging mechanisms.<br />
Additional arrangement for hand turning shall be provided for use in case the<br />
automatic turning system fails to operate.<br />
3.3.2.3 Load Gear and Accessories Drive Gear<br />
The turbine shall be equipped with good quality and suitable load gear equipment<br />
of proper rating if required to match the generator speed for 50 Hz generation.<br />
Load gear shall be totally enclosed and be equipped with forced lubricating device<br />
to the gear.<br />
The turbine shall also be equipped with suitable accessories driven gear unit.<br />