5. TRANSFORMERS<br />

5.1 GENERAL<br />

The transformers shall be designed and tested in accordance with IEC 76<br />

(1) Generator Step-up Transformer<br />

Single phase, oil immersed, self cooled / forced air cooled (ONAN / ONAF),<br />

outdoor use type for stepping up the voltage from 11 KV to 230 KV with on load<br />

tap changer having uniform insulation.<br />

The maximum continuous rating of the transformer shall meet at any taps a total<br />

output of the generator, as defined in Vol. 2 of 3 clause 4.1.2 Generator Rating,<br />

which is connected with the transformer in series as shown in the attached single<br />

line diagram. The maximum continuous rating of each transformer (one threephase<br />

bank of three single-phase Transformers out of four single-phase<br />

Transformers and Vector Group = Ynd 11 ) shall be 120% (one hundred and twenty<br />

per cent) of the corresponding MVA (pf=0.8) of the Guaranteed Net Generator<br />

output at Site condition of 35 0 C, 1.013 bar and 98% RH.<br />

The self cooled capacity shall not be less than 75 % of forced air cooled capacity.<br />

(2) Station Transformers<br />

Three phase, oil immersed type, self air cooled (ONAN) for stepping down the<br />

voltage from 6.6 kV to 415 V with off load tap changer. The capacity of each<br />

auxiliary transformer shall enable to supply 120% of the required power for the<br />

unit 415 V system.<br />

(3) Unit Auxiliary Transformer<br />

Three phase, oil immersed type, self air-cooled (ONAN) for stepping up the<br />

voltage from 15 kV to 6.6 KV with off circuit tap changer. The capacity of station<br />

transformer shall enable to supply start-up power, medium voltage loads and<br />

common station load.<br />

5.1.1 REQUIREMENT FOR CHARACTERISTICS<br />

(1) Efficiency<br />

The transformers shall be of highest efficiency that the Contractor can attain.<br />

(2) Temperature Rise<br />

The temperature rise of the windings shall not exceed 55 0 C when measured by he<br />

resistance method, after circulating the rated current at rated frequency in the<br />

windings under test.<br />

The temperature rise of top insulation oil shall not exceed 55 0 C when measured<br />

by a thermometer in an oil filled thermometer pocket on the cover or in the outlet<br />

pipe to the cooler, and the method of the test of temperature rise will be decided<br />

in accordance with IEC 76-2 .<br />

(3) Dielectric Test Voltage<br />

The transformers shall withstand the following test voltages in accordance with<br />

IEC 76-3.<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)<br />

46