e) Providing various drain lines with isolation valves at drain points from the<br />

compressor and turbine to drain the wash water during washing cycle.<br />

f) Providing bearing seal air piping to protect bearing during washing cycle.<br />

g) Drainage system to drain out the water.<br />

2. Compressor wash water quality<br />

Total trace elements in compressor wash water (after adding detergent)<br />

will preferably be limited as follows.<br />

No. Trace Metal For Million Parts of<br />

Water by weight<br />

Sodium & Potassium<br />

30 ppm<br />

Calcium<br />

10 ppm<br />

pH 7.5 to 8.0<br />

The bidder shall design, manufacture and supply all the components (Viz.<br />

water tank, piping, valves, strainer, drains, manifolds, injection nozzles etc.) of<br />

the above mentioned compressor wet washing system of suitable grade of<br />

material to handle the above wash water without any deterioration. The bidder<br />

shall clearly specify the proposed grade of materials of the above components.<br />

The bidder shall provide complete system including Demi Water Plant as per<br />

manufacturer's recommendation (if required).<br />

3.3.2.5 Governor System<br />

The gas turbine unit shall be provided with a complete governing system which<br />

shall be capable of maintaining a required constant speed under conditions of load<br />

variations, control the turbine load, combustion gas temperatures and prevent<br />

turbine over-speed. The characteristics of the turbine generator unit and its<br />

governor shall be such that the machine operates satisfactorily in parallel with<br />

existing generating unit in the system.<br />

The speed governing system shall be provided with speed changing device<br />

capable of local and remote control. Provision shall be made to shutdown the<br />

turbine under emergency by local and remote control. The speed regulation shall<br />

be adjustable (from no load to full load) between plus and minus 5 %. The rated<br />

speed at no load condition shall be adjustable within ±0.5 % for easy<br />

synchronising. The governing system for the unit shall also be provided with<br />

automatic over-speed trip devices adjustable up to 110 % of the rated speed, and<br />

a load limiter.<br />

The governing system shall include an adjustable load limit control, minimum fuel<br />

regulator, temperature limit control, temperature increment rate control and<br />

necessary protection equipment.<br />

The governing system shall be suitable for parallel operation with a large power<br />

system and also for completely isolated and independent operation. In addition to<br />

the automatic speed governing system, a separate emergency over-speed trip<br />

mechanism and over combustion gas temperature trip system shall be furnished<br />

on the unit.<br />

These systems shall operate to shut the emergency fuel trip valves.<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)<br />