Enclosure insulation, ventilation, and cooling shall be provided to maintain<br />

temperatures suitable for personnel and for all systems whether standby or<br />

operating. Unit control rooms shall be ventilated and air-conditioned.<br />

Turbine compartment and generator compartment shall be adequately ventilated<br />

utilising forced ventilation with louvers and bug screens as required for protection<br />

of the houses equipment from outdoor environmental conditions.<br />

Adequate interior lighting shall be provided, and emergency DC lighting shall also<br />

be provided, and those shall be energised through an automatic throw over<br />

contractor when AC source fails.<br />

Enclosures shall be provided with 240 volt AC service outlets.<br />

3.3.2.11 Fire Protection Equipment<br />

The entire gas turbine generating unit including all auxiliary compartment shall be<br />

automatically protected from fire with complete fire protection system complete<br />

with C0 2 gas system, fire detectors, pipe works, control and safety device.<br />

Actuation of the fire protection system shall be indicated at the control<br />

compartment and by a visual and an audible alarm to warn any personnel in the<br />

compartments.<br />

3.3.2.12 Casing Design<br />

The casings of all the rotary parts on the main unit shall be spilt horizontally for<br />

easy dismantling and inspection. Lugs for lifting the upper casing shall be<br />

provided at points which will lift the casing half well balanced. Complete lifting<br />

gear together with lifting drawing and instruction shall be furnished.<br />

3.3.2.13 Insulation And Lagging<br />

Thermal insulation shall be provided where necessary and is to include such parts<br />

as the combustion chambers, exhaust ducts and hoods. Removable insulation<br />

blankets shall be provided in all parts where insulation must he removed for<br />

maintenance purposes.<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)<br />