c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>r and which <strong>co</strong>uld lead <str<strong>on</strong>g>to</str<strong>on</strong>g> his/her downfall, such applicati<strong>on</strong> may be<br />

c<strong>on</strong>sidered.<br />

16.2.7.6 When prices are subject <str<strong>on</strong>g>to</str<strong>on</strong>g> adjustment as a result of escalati<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> price of escalati<strong>on</strong><br />

in <str<strong>on</strong>g>the</str<strong>on</strong>g> prices of labour and material, <str<strong>on</strong>g>the</str<strong>on</strong>g> bidder must indicate <str<strong>on</strong>g>the</str<strong>on</strong>g> various<br />

elements/fac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs of <str<strong>on</strong>g>the</str<strong>on</strong>g> bid price that will escalate (e.g. labour, transport, fuel, protective<br />

clothing, etc.) <str<strong>on</strong>g>the</str<strong>on</strong>g> base date and <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant index and index numbers which were used<br />

in calculating <str<strong>on</strong>g>the</str<strong>on</strong>g> bid price.<br />

16.2.7.7 When prices are based <strong>on</strong> a supplier’s price list, a <strong>co</strong>py of <str<strong>on</strong>g>the</str<strong>on</strong>g> original price list <strong>on</strong> which<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> bid prices were based, must be enclosed with <str<strong>on</strong>g>the</str<strong>on</strong>g> bid document.<br />

16.2.7.8 All applicati<strong>on</strong>s for price adjustments must be thoroughly checked in order <str<strong>on</strong>g>to</str<strong>on</strong>g> ensure<br />

that it is in ac<strong>co</strong>rdance with <str<strong>on</strong>g>the</str<strong>on</strong>g> terms and c<strong>on</strong>diti<strong>on</strong>s of <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>tract, that all required<br />

documentary evidence is submitted and that <str<strong>on</strong>g>the</str<strong>on</strong>g> calculati<strong>on</strong>s are <strong>co</strong>rrect.<br />

Price adjustment of n<strong>on</strong>-firm prices subject <str<strong>on</strong>g>to</str<strong>on</strong>g> escalati<strong>on</strong><br />

16.2.7.9 To ensure fair price adjustment, <str<strong>on</strong>g>the</str<strong>on</strong>g> bidder must give a breakdown of <str<strong>on</strong>g>the</str<strong>on</strong>g> price offered<br />

as well as <str<strong>on</strong>g>the</str<strong>on</strong>g> C<strong>on</strong>sumer Price Index (CPI) indica<str<strong>on</strong>g>to</str<strong>on</strong>g>rs for each of <str<strong>on</strong>g>the</str<strong>on</strong>g> price fac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs that<br />

make up <str<strong>on</strong>g>the</str<strong>on</strong>g> price offered. Where it is not possible <str<strong>on</strong>g>to</str<strong>on</strong>g> obtain <str<strong>on</strong>g>the</str<strong>on</strong>g> index figures linked <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

a specific fac<str<strong>on</strong>g>to</str<strong>on</strong>g>r, <str<strong>on</strong>g>the</str<strong>on</strong>g> average CPI index for that m<strong>on</strong>th must be used.<br />

16.2.7.10 Price adjustments will <strong>on</strong>ly be allowed based <strong>on</strong> 85% of <str<strong>on</strong>g>the</str<strong>on</strong>g> original bid price that were<br />

offered. The remainder of <str<strong>on</strong>g>the</str<strong>on</strong>g> original bid price (15%) is seen as fixed <strong>co</strong>sts and will<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g>refore not be subject <str<strong>on</strong>g>to</str<strong>on</strong>g> price adjustments (MBD 3.2)<br />

Price adjustment of n<strong>on</strong>-firm prices subject <str<strong>on</strong>g>to</str<strong>on</strong>g> exchange variati<strong>on</strong>s<br />

16.2.7.11 Exchange rate adjustments must ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r be d<strong>on</strong>e;<br />

(a) where a specific item is procured from overseas; or<br />

(b) when a c<strong>on</strong>tract is signed over a specific period and it is agreed that exchange rate<br />

adjustments will be d<strong>on</strong>e throughout <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>tract period at specific dates.<br />

6.2.7.12 In <str<strong>on</strong>g>the</str<strong>on</strong>g> case where specific item/goods are procured from overseas, and <str<strong>on</strong>g>the</str<strong>on</strong>g> price is<br />

linked with an exchange rate, it will be essential for <str<strong>on</strong>g>the</str<strong>on</strong>g> supplier <str<strong>on</strong>g>to</str<strong>on</strong>g> furnish <str<strong>on</strong>g>the</str<strong>on</strong>g> following<br />

particulars as part of <str<strong>on</strong>g>the</str<strong>on</strong>g>ir financial proposal in <str<strong>on</strong>g>the</str<strong>on</strong>g> MBD 3.2 form:<br />

(a) <str<strong>on</strong>g>the</str<strong>on</strong>g> financial instituti<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>y are banking with;<br />

(b) <str<strong>on</strong>g>the</str<strong>on</strong>g> porti<strong>on</strong> of <str<strong>on</strong>g>the</str<strong>on</strong>g> price that is subject <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> rate of exchange;<br />

(c) <str<strong>on</strong>g>the</str<strong>on</strong>g> amounts that will be remitted abroad; and<br />

(d) <str<strong>on</strong>g>the</str<strong>on</strong>g> exchange rate valid when <str<strong>on</strong>g>the</str<strong>on</strong>g> bid price offered was calculated.<br />

6.2.7.13 The bidder must give proof of payment that were made <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> overseas supplier and<br />

what <str<strong>on</strong>g>the</str<strong>on</strong>g> exchange rate were when <str<strong>on</strong>g>the</str<strong>on</strong>g> payment was made and will form <str<strong>on</strong>g>the</str<strong>on</strong>g> basis of<br />

future adjustments.<br />

Price adjustment not subject <str<strong>on</strong>g>to</str<strong>on</strong>g> an escalati<strong>on</strong> formula<br />

16.2.7.14 In cases where a c<strong>on</strong>tract is signed over a specific period and it is agreed that price<br />

adjustments will be d<strong>on</strong>e annually <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> anniversary of <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>tract, <str<strong>on</strong>g>the</str<strong>on</strong>g> average<br />

C<strong>on</strong>sumer Price Index (CPI) for <str<strong>on</strong>g>the</str<strong>on</strong>g> preceding 12 (twelve) m<strong>on</strong>ths shall apply.<br />

16.2.7.15 The following c<strong>on</strong>diti<strong>on</strong>s shall apply for all price adjustment:<br />

(a) shall <strong>on</strong>ly be allowed at <str<strong>on</strong>g>the</str<strong>on</strong>g> periods and times as stipulated in <str<strong>on</strong>g>the</str<strong>on</strong>g> bidding<br />

documents and/or c<strong>on</strong>tract documents;<br />

(b) shall not exceed <str<strong>on</strong>g>the</str<strong>on</strong>g> formulas as stipulated above;<br />