13 September Berlin / Dresden - Corio.eu
13 September Berlin / Dresden - Corio.eu
13 September Berlin / Dresden - Corio.eu
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
KÖNIGSGALERIE – DUISBURG – GERMANY<br />
Ground Floor<br />
Second Floor<br />
Third Floor<br />
www.multi.<strong>eu</strong><br />
First Floor<br />
Program & concept<br />
Fundamentals<br />
• Well located city center redevelopment<br />
linked to Duisburg’s Königstraße prime<br />
retail pitch.<br />
• Next to city center ring and metro<br />
station<br />
• Expected to (re)open during Q1 2011<br />
Program<br />
• 16.939 m² total gla mixed use<br />
• 2.787 m² anchors<br />
• 922 m² mid size units<br />
• 4.597 m² shops<br />
• 2.291 m² leisure and gastronomy<br />
• 5.668 m² quality office<br />
• 674 m² others<br />
• 318 lot parking garage<br />
Concept<br />
• City center urban multi level scheme<br />
• Passage connection between<br />
Königstraße prime pitch and<br />
Sonnenwall boutique retail street<br />
• Multi Development has commissioned<br />
the internationally renowned Benoy<br />
architectural angency to redesign the<br />
Galeria Duisburg<br />
• The facade of the future Königsgalerie<br />
on the Kuhstrasse will feature a glass<br />
front, through which daylight will stream<br />
• The curved new look will give the<br />
property an extravagant flair<br />
• The interior will also be dominated by a<br />
flowing structure<br />
• 2 retail sales floors with public access<br />
• 3 rd anchor retail floor internally<br />
connected<br />
• Parking garage underneath<br />
Tenants<br />
• Leasing of Königsgalerie to be initiated<br />
by Multi Germany with support of Multi<br />
Corporation.