26.11.2014 Views

Areva EPR

Areva EPR

Areva EPR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 t<br />

+8.50m<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

1<br />

2<br />

8<br />

6<br />

1<br />

5<br />

2<br />

4<br />

3<br />

6<br />

4<br />

5<br />

4<br />

1<br />

3<br />

1<br />

5<br />

2<br />

3<br />

2<br />

6<br />

5<br />

4<br />

10<br />

9<br />

6<br />

2<br />

1<br />

2<br />

5<br />

12<br />

1<br />

11<br />

2<br />

10<br />

3<br />

9<br />

8<br />

7<br />

4<br />

3<br />

6<br />

10<br />

9<br />

2<br />

8<br />

7<br />

4<br />

6<br />

5<br />

6<br />

1<br />

5<br />

2<br />

4<br />

3<br />

2<br />

1<br />

+12.76m<br />

2<br />

1<br />

8<br />

1<br />

7<br />

6<br />

5<br />

4<br />

4<br />

3<br />

2<br />

3<br />

1<br />

2<br />

Miscellaneous plan view<br />

SAFEGUARD<br />

BUILDING<br />

DIVISION 2<br />

SAFEGUARD<br />

BUILDING<br />

DIVISION 3<br />

I & C SERVICE CENTER<br />

TECHNICAL SUPPORT CENTER<br />

DOCUMENTATION ROOM<br />

SHIFT OFFICE<br />

TOILETS<br />

KITCHEN<br />

SURVEIL.<br />

SYSTEM<br />

MAIN CONTROL ROOM<br />

TAGGING ROOM<br />

MCR<br />

ENTRANCE<br />

HATCH<br />

TOOLS SPARE<br />

PARTS<br />

ACCESS<br />

CONTROL<br />

ROOM<br />

SICS 1/COMPUTER ROOM 1 SICS 2 /COMPUTER ROOM 2<br />

SAFEGUARD<br />

BUILDING<br />

DIVISION 1<br />

+14.97 +14.97<br />

INCORE<br />

INSTRUMEN.<br />

+13.80<br />

SAFEGUARD<br />

BUILDING<br />

DIVISION 4<br />

ACCU<br />

ACCU<br />

ANTEROOM<br />

MHSI PUMP<br />

+13.80<br />

+11.10<br />

+12.36<br />

PRESSU-<br />

RIZER<br />

+12.36<br />

+13.80<br />

3 1<br />

SWITCHGEARS<br />

SWITCHGEARS<br />

+11.10<br />

EFWS PUMP<br />

SERVICE CORRIDOR<br />

SUMP<br />

VALVE<br />

LHSI PUMP<br />

+13.80<br />

+13.80<br />

+13.80<br />

+13.80<br />

5 4 3<br />

7 6<br />

10 9<br />

7 8<br />

4 3<br />

5 4<br />

2 1<br />

3 1<br />

CCWS PUMP<br />

CHRS PUMP<br />

AIR<br />

LOCK CHRS<br />

SUMP VALVE<br />

PASSAGEWAY<br />

ACCU<br />

+13.80<br />

+13.80<br />

+11.10<br />

+13.80<br />

STORAGE<br />

POOL<br />

+7.44<br />

+11.10<br />

+13.80<br />

+13.80<br />

ACCU<br />

I&C CABINETS<br />

+8.10<br />

I&C CABINETS<br />

BATTERIES 220 V<br />

IODINE FAN<br />

+13.80<br />

HVAC DISTRIBUTION<br />

TRANSFER PIT<br />

HVAC DISTRIBUTION<br />

PIPE DUCT<br />

VAPOUR<br />

COMPRESSOR<br />

VAPOUR<br />

COMPRESSOR<br />

SERVICE CORRIDOR<br />

+17.30m<br />

IODINE FAN<br />

MONITOR AIR<br />

ACTIVITY<br />

EXHAUST BOOSTER<br />

FANS<br />

+16.70m<br />

+13.80m<br />

LOADING<br />

PIT<br />

+9.70m<br />

+5.10m<br />

+6.30m<br />

KLA/EBA KLA/EBA<br />

FILTERS FAN<br />

DECONT SYSTEM<br />

FOR RCP<br />

VAPOUR<br />

COMPRESSOR<br />

CONDENSER AND<br />

SPENT FUEL STORAGE POOL<br />

GASCOOLER<br />

HEPA FILTERS<br />

+16.70m<br />

VALVE ROOM<br />

BORON<br />

PREPARATION<br />

TANK<br />

DELAY BEDS<br />

HEPA FILTERS<br />

0 246810 20m<br />

FUEL BUILDING<br />

MATERIAL LOCK<br />

NUCLEAR AUXILIARY<br />

BUILDING<br />

† The <strong>EPR</strong> Nuclear Island design has undisputed advantages for operators,<br />

especially where radiation protection and ease of maintenance are concerned.<br />

• The layout is optimized and based on the strict separation of redundant systems.<br />

• The distinction between access-controlled areas containing radioactive<br />

equipment and non-controlled areas significantly contributes to reduce<br />

exposure of the operating personnel.<br />

• Maintenance requirements were systematically taken into account at the earliest<br />

stage of the design. For example, large setdown areas have been designed to<br />

make maintenance operations easier for operating personnel.<br />

I 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!