■ <strong>EPR</strong> NUCLEAR ISLAND<br />

CONTROL ASSEMBLIES<br />

†<br />

The control assemblies, inserted in the core through the guidethimbles<br />

of fuel assemblies, provide reactor power control and<br />

reactor trip.<br />

Rod Cluster Control Assemblies<br />

The core has a fast shutdown control system comprising 89 Rod<br />

Cluster Control Assemblies (RCCAs). All RCCAs are of the same<br />

type and consist of 24 identical absorber rods, fastened to a<br />

common head assembly. These rods contain neutron absorbing<br />

materials. When they are totally inserted in the core, they cover<br />

almost the whole active length of the fuel assemblies.<br />

The <strong>EPR</strong> is equipped with RCCAs of the HARMONI type, a proven<br />

Framatome ANP design. The neutron absorbing components are<br />

bars made of an Ag, In, Cd alloy and sintered pellets of Boron<br />

carbide (B4C). Each rod is composed of a stack of Ag, In, Cd bars<br />

and B4C pellets contained in a stainless steel cladding under a<br />

Helium atmosphere (for efficient cooling of the absorbing materials).<br />

Because mechanical wear of the rod claddings happens to be a<br />

limiting factor for the operating life of RCCAs, the HARMONI<br />

claddings benefit from a specific treatment (ion-nitriding) that makes<br />

their external surface extremely wear-resistant and eliminates the<br />

cladding wear issue.<br />

The RCCAs are assigned to different control bank groups.<br />

37 RCCAs are assigned to control average moderator temperature<br />

and axial offset, and 52 RCCAs constitute the shutdown-bank. The<br />

first set is divided into five groups split into quadruplets. These<br />

quadruplets are combined to form four different insertion sequences<br />

depending on cycle depletion. This sequence can be changed at<br />

any time during operation, even at full power. A changeover is<br />

performed at regular intervals, approximately every 30 equivalent<br />

full power days, to rule out any significant localized burnup delay.<br />

At rated power the control banks are nearly withdrawn. At<br />

intermediate power level, the first quadruplet of a sequence can be<br />

deeply inserted and the second may be also inserted. Shutdown<br />

margins are preserved by the RCCA insertion limits.<br />

† The <strong>EPR</strong> is equipped with RCCAs of the<br />

proven HARMONI design that guarantees<br />

a long operating life whatever the<br />

operating mode of the reactor.<br />

RCCA manufacturing at the FBFC Pierrelatte (France) fuel fabrication plant.<br />