■ <strong>EPR</strong> NUCLEAR ISLAND<br />
CONTROL ASSEMBLIES<br />
†<br />
The control assemblies, inserted in the core through the guidethimbles<br />
of fuel assemblies, provide reactor power control and<br />
reactor trip.<br />
Rod Cluster Control Assemblies<br />
The core has a fast shutdown control system comprising 89 Rod<br />
Cluster Control Assemblies (RCCAs). All RCCAs are of the same<br />
type and consist of 24 identical absorber rods, fastened to a<br />
common head assembly. These rods contain neutron absorbing<br />
materials. When they are totally inserted in the core, they cover<br />
almost the whole active length of the fuel assemblies.<br />
The <strong>EPR</strong> is equipped with RCCAs of the HARMONI type, a proven<br />
Framatome ANP design. The neutron absorbing components are<br />
bars made of an Ag, In, Cd alloy and sintered pellets of Boron<br />
carbide (B4C). Each rod is composed of a stack of Ag, In, Cd bars<br />
and B4C pellets contained in a stainless steel cladding under a<br />
Helium atmosphere (for efficient cooling of the absorbing materials).<br />
Because mechanical wear of the rod claddings happens to be a<br />
limiting factor for the operating life of RCCAs, the HARMONI<br />
claddings benefit from a specific treatment (ion-nitriding) that makes<br />
their external surface extremely wear-resistant and eliminates the<br />
cladding wear issue.<br />
The RCCAs are assigned to different control bank groups.<br />
37 RCCAs are assigned to control average moderator temperature<br />
and axial offset, and 52 RCCAs constitute the shutdown-bank. The<br />
first set is divided into five groups split into quadruplets. These<br />
quadruplets are combined to form four different insertion sequences<br />
depending on cycle depletion. This sequence can be changed at<br />
any time during operation, even at full power. A changeover is<br />
performed at regular intervals, approximately every 30 equivalent<br />
full power days, to rule out any significant localized burnup delay.<br />
At rated power the control banks are nearly withdrawn. At<br />
intermediate power level, the first quadruplet of a sequence can be<br />
deeply inserted and the second may be also inserted. Shutdown<br />
margins are preserved by the RCCA insertion limits.<br />
† The <strong>EPR</strong> is equipped with RCCAs of the<br />
proven HARMONI design that guarantees<br />
a long operating life whatever the<br />
operating mode of the reactor.<br />
RCCA manufacturing at the FBFC Pierrelatte (France) fuel fabrication plant.<br />