Areva EPR
Areva EPR
Areva EPR
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Steam generator cutaway<br />
Secondary<br />
manway<br />
Auxiliary<br />
feedwater<br />
nozzle<br />
Upper<br />
lateral<br />
support<br />
brackets<br />
Tie rod<br />
Bundle<br />
wrapper<br />
Partition<br />
plate<br />
(secondary<br />
side)<br />
Steam outlet<br />
nozzle<br />
Dryer frame<br />
Swirl vane<br />
separator<br />
Auxiliary<br />
feedwater ring<br />
Feedwater ring<br />
Feedwater nozzle<br />
Bundle double<br />
wrapper<br />
Anti-vibration<br />
bar<br />
Tube support<br />
plates<br />
Tube bundle<br />
CHARACTERISTICS<br />
DATA<br />
Steam generators<br />
Number 4<br />
Heat transfer surface per steam generator 7,960 m 2<br />
Primary design pressure<br />
176 bar<br />
Primary design temperature 351 °C<br />
Secondary design pressure<br />
100 bar<br />
Secondary design temperature 311 °C<br />
Tube outer diameter/wall thickness 19.05 mm / 1.09 mm<br />
Number of tubes 5,980<br />
Triangular pitch<br />
27.43 mm<br />
Overall height<br />
23 m<br />
Materials<br />
• Tubes<br />
Alloy 690 TT*<br />
• Shell 18 MND 5<br />
• Cladding tube sheet<br />
Ni Cr Fe alloy<br />
• Tube support plates 13% Cr improved stainless steel<br />
Miscellaneous<br />
Total mass<br />
500 t<br />
Feedwater temperature 230 °C<br />
Moisture carry – over 0.1%<br />
Main steam flow at nominal conditions<br />
2,554 kg/s<br />
Main steam temperature 293 °C<br />
Saturation pressure at nominal conditions<br />
78 bar<br />
Pressure at hot stand by<br />
90 bar<br />
* TT: Thermally treated<br />
Tube<br />
sheet<br />
Partition<br />
plate (primary<br />
side)<br />
Primary<br />
manway<br />
Transportation of a steam generator manufactured in China for Ling-Ao 2.<br />
Flow distribution<br />
baffle<br />
Channel head<br />
Primary coolant<br />
outlet nozzle<br />
† The steam generator is an enhanced<br />
version of the axial economizer steam<br />
generator implemented on N4 plants.<br />
† The axial economizer allows increasing by<br />
3 bar the steam pressure output compared<br />
to a conventional design, without impairing<br />
access to the tube bundle for inspection<br />
and maintenance.<br />
† The very high steam saturation pressure<br />
at tube bundle outlet (78 bar) is a major<br />
contributor to the high efficiency of the<br />
<strong>EPR</strong> (37%).<br />
† The secondary water mass is consistent<br />
with the 30 min. time period before steam<br />
generator dry-out in case of loss of all<br />
feedwater systems.<br />
† The increase of the steam volume and<br />
the set pressure of the secondary safety<br />
valves prevent any liquid release to the<br />
environment in case of steam generator<br />
tube rupture.<br />
I 27