Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Logistics 19<br />
for airport parking and car rental<br />
services.<br />
The Dubai World Central International<br />
Airport (JXB) will have handling capacity<br />
of over 12 million tonnes of cargo a year,<br />
120 million passengers annually and<br />
capable of handling all new generation<br />
aircraft.<br />
Dubai Logistics City (DLC)<br />
This key plank in Dubai’s integrated<br />
multi-model logistics proposition<br />
represents Phase I of Dubai World<br />
Central. Spanning over 25 square<br />
kilometres, Dubai Logistics City is<br />
designed to ultimately handle 12 million<br />
tonnes of air cargo annually in up to 16<br />
air cargo terminals. Work on the<br />
project, which is due to be operational<br />
at the end of next year, is<br />
already underway. Work<br />
on Phase 1 has already<br />
commenced and<br />
infrastructure is expected<br />
to be<br />
complete by 2007. Work is progressing<br />
well on the first 4.5 kilometre, CAT III,<br />
all-weather runway which allows for<br />
automatic landing.<br />
DLC will have its own aviation area, a<br />
dedicated cluster for specialised<br />
aviation industry suppliers and offering<br />
direct apron access and a dedicated<br />
labour village accommodating up to<br />
40,000 workers in purpose-built<br />
surroundings. The labour village, in a<br />
built-up area of 350,000 square metres,<br />
will be built and managed by DLC.<br />
Residential City:<br />
To be developed in three phases and<br />
covering some 7.16 million square<br />
metres, freehold land plots in<br />
Residential City are to be offered to<br />
developers<br />
on the open<br />
market who<br />
will then<br />
build in<br />
accordance<br />
with master<br />
p l a n<br />
guidelines.<br />
Phase 1 will<br />
see land plots<br />
for sale by the end of<br />
2007. Up to 250,000<br />
people are expected to<br />
live in the “city”<br />
where some 20,000<br />
people will be<br />
employed. The<br />
Dubai Metro<br />
will serve<br />
Residential<br />
City which<br />
will also<br />
have a<br />
dedicated,<br />
integrated<br />
r o a d<br />
network.<br />
The city<br />
w i l l<br />
include<br />
three<br />
hotels – five-star, four-star and threestar<br />
properties – and a shopping mall.<br />
Homes will be a mix of two-storey villas<br />
and luxury apartments in blocks ranging<br />
up to 24 storeys in height.<br />
Commercial City:<br />
To be developed in five phases, this<br />
“city” will cover some 14.53 million<br />
square metres. Designed as Dubai World<br />
Central’s business and finance hub,<br />
Commercial City will feature more than<br />
850 towers, ranging from 6-75 storeys in<br />
height – which will be home to a variety<br />
of businesses expected to employ<br />
around 130,000 people and offer super<br />
deluxe homes. A cluster of luxury villas<br />
are also included in the master plan.<br />
The first phase is expected to be<br />
completed by the end of 2009.<br />
The super-deluxe apartments within<br />
Dubai World Central will range from 2-<br />
75 storeys in height with the highest<br />
buildings mainly in Commercial City,<br />
which will be in Dubai World Central’s<br />
business and finance centre.<br />
The “city” will also boast up to 25<br />
hotels ranging from deluxe, through to<br />
five-star, four-star and three-star.<br />
Golf Resort:<br />
Dubai World Central will feature two<br />
18-hole golf courses each having a<br />
distinct feel from a traditional desert<br />
links style to a more lush tropical resort<br />
course. There will also be extensive<br />
practice facilities, driving ranges and<br />
putting greens as well as a luxury<br />
clubhouse with restaurants and a proshop.<br />
Plots in Golf Resort will be offered<br />
on the open market to a private<br />
developer.<br />
Up to 2,500 freehold homes – ranging<br />
from two storey villas to 24-storey<br />
apartment blocks – will surround the<br />
courses. It will also feature a high-end<br />
boutique hotel complete with a spa<br />
resort and around 150 rooms.<br />
Enterprise Park:<br />
This will be the region’s premier<br />
centre of excellence for technology<br />
manufacturing and science and<br />
technology education. Phase 1 is<br />
expected to be completed by the end<br />
of 2008.<br />
Supply Chain & Logistics Group | www.sclgme.org