• Automatic Folder Creation:<br />

The Resident Engineer (R.E) is required to submit the Pro ject Information Form (PIF) by email<br />

to the Subsite Admin/District <strong>Materials</strong> Engineer<br />

When the R.E submits a Project Information Form, to the District Material Engineer (DME) or<br />

the District designee, the District Subsite Administrator creates a subsequent contract folder<br />

under the Contract Documents Library and uploads the PIF form/document in the District Sub<br />

site.<br />

The name of the Form/Document should always begin with “PIF”. ex PIF12345<br />

A trigger will then au tomatically create the following folder structure after the contract folder is<br />

created.<br />

o Automatic Folder Structure Creation<br />

District<br />

Contract Number<br />

RMS 360<br />

RMS 768<br />

Approved<br />

RMS 784<br />

Approved<br />

IAD<br />

Approved<br />

Metals<br />

Approved<br />

Certifications<br />

Bearings<br />

Lighting & Signs<br />

Steel Superstructure<br />

Railings<br />

Joints<br />

Reports<br />

Miscellaneous<br />

Precast<br />

Approved<br />

Acceptance<br />

HMA/WMA<br />

Concrete Ready Mix<br />

Soils & Aggregates<br />

Misc<br />

1<br />

3